BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a mixed-use development in Anchorage, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 5, 2025 this project was awarded to QAP in the amount of $2,012,851.86. The start and completion date has not yet been determined. Consisting of approximately 350 S.Y. of Sidewalk and Concrete Apron Removal and Replacement:14 Each Curb Ramps; 2,650 L.F. of Curb and Gutter Removal and Replacement; 5,467 Tons of A.C. Pavement; 7,650 S.Y. of Pavement Removal; 26,700 S.Y. of Pavement Rotomilling; 2 Catch Basin; 1 Storm Drain Manhole; 346 L.F. of Storm Pipe Removal and Replacement; and other related work. Additive Alternate 1 - Median and Striping Modifications: 620 L.F. of Curb and Gutter Removal and Replacement; 603 Tons of A.C. Pavement; 110 S.Y. of Pavement Removal; and other related work ESTIMATED CONSTRUCTION COST: Between $1,000,000 - $3,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. Questions Due: 12PM Local Time, May 14, 2025 TIME OF COMPLETION This Project shall be Substantially Completed within ninety (90) calendar days after the Notice-to-Proceed is issued. The Contract Completion date shall be achieved within fifteen (15) calendar days after the Substantial Completion letter is issued. The total contract days for this Project is one hundred and five (105).

Award

Roads / Highways

$2,012,852.00

Public - City

Paving, Site Work

59

7

4

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
4
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2025

June 23, 2025

Project location map

Dowling Rd, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.