BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Renovation of a military facility in Anchorage, Alaska. Completed plans call for the renovation of a military facility.

This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code. Questions and/or comments relative to these documents should be submitted via the Bidder Inquiry system as indicated below. All questions and/or comments should be submitted no later than ten (10) calendar days prior to the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$75,000,000.00

Public - Federal

Renovation

290

10

55

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
18
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 2, 2025

Project location map

To Be Determined, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.