BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work for a mixed-use development in Charlotte, North Carolina. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

**As of August 7, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Eastland Park Project Bid, Performance, and Payment & Material bonds are required. Mecklenburg County reserves the right to waive technicalities and to reject any or all proposals. Question Deadline 06/20/2025 Questions must be submitted to Jeff Mis (jmis@landdesign.com) Existing Foundation Investigation F&R performed a series of non-destructive testing to locate and document the location of the existing shallow foundation system at the former Eastland Mall site. The following services were performed and will be documented under separate cover: Performed ground penetrating radar (GPR) and electromagnetic induction (EMI) testing to establish the limits of the shallow foundations; Developed a drawing of the shallow foundation locations; Developed an estimated volume for the buried foundation system. Preliminary Subsurface Exploration and Geotechnical Engineering F&R performed subsurface exploration and geotechnical engineering evaluations to provide the following preliminary recommendations: Description of the site subsurface conditions including the preparation of typed boring logs and subsurface profiles; Description of the site groundwater conditions; Preliminary geotechnical engineering recommendations for site preparation and earthwork activities; Preliminary geotechnical recommendations for foundation design and construction; Preliminary geotechnical recommendations for pavement construction; and, Preliminary recommendations for quality assurance and materials testing. PROJECT DESCRIPTION: (Refer to Contract Documents for Full Description): The project includes +/- 4.5 acres of new public park space. The project includes the installation of a new restroom/storage building, a stage/pavilion, an interactive water feature, a new playground, artificial turf areas, sidewalks, curbs, walls, fencing, handrails, furnishings, lawn and landscaping as drawn and detailed in the Contract Documents dated May 8, 2025. Site Work o Existing Conditions + Demolition o Erosion Control o Earthwork - Existing Soil Stockpile o Site Utilities - Charlotte Water, Duke Energy o Stormwater + Sanitary Sewer o Concrete and Specialty Decorative Paving o Site Walls - Cast-in-Place, Precast, and Retaining o Playground Equipment Installation (By Owner) o Artificial Turf Instillation o Site Furnishings Installation o Landscape, Soils + Irrigation Architecture o Restroom and Maintenance Facility o Event Stage Water Feature o Interactive Water Feature

Bid Results

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - County

Site Work

192

25

25

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
141
Bidding Soon
1,679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

July 28, 2025

Project location map

5595 Central Ave, Charlotte, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.