BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 4, 2026

Site work and paving for a mixed-use development in Mount Angel, Oregon. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

Region 2 OR214 Curb Ramps (Mt. Angel) Section Hillsboro - Silverton Highway Mike Hawkins, DOWL PM Wade Luckman, RE OR214 Curb Ramps (Mt. Angel) Section of the Hillsboro-Silverton Highway (Rt. No. OR214) in Mt. Angel. FAP No. S140(050). ($ 1,000,000 - $ 2,000,000). Req. approx. 1,000 ft2 temp sign; 300 hr flag; 200 ft PCD; 32 ea inlet protect; 100 ton contam soil disp; 5 ea soil sample test; 1 ton painted conc; const surv work; 3,050 yd2 rem surface; 3,040 ft sawcut; 1,480 yd2 subg geotext; 115 ft vid insp; 115 ft pipe; 10 ea conc structure; 36 yd2 trench resurf; 1,345 ton aggr base; 401 ton ACP; 240 ft2 slope pave; 1,769 ft conc curb; 15,450 ft2 conc surface; 713 ft2 trunc dome; 48 ft2 detectable guide strip; 454 ft pvmt marking durable; 7 ea crossw closure; 396 fbm wood sign supp; 1,046 lb sign supp; 4 ft2 sign; flashing beacon light; 150 yd2 seed; 20 yd3 topsoil; 20 yd3 bark mulch. Completion Time: August 31, 2027. Classes of Work: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 001 - OR214 Curb Ramps (Mt. Angel) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
76
Bidding Soon
1,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

September 28, 2026

Project location map

OR-214, Mount Angel, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.