BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Site work and paving for a road / highway in Summit, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Route 78 WB, From Drift Road/Dale Road to Route 124, Contract No. 043253010, Pavement Preservation, Township of Union, Township of Millburn, Township of Springfield, City of Summit, Essex County; Township of Berkeley Heights, Union County; Borough of Watchung, Somerset County; Federal Project No: 0078(344), UPC No: 253010, PE No: 2207030, CE No: 2010522 Estimated Completion Date on 11/20/2026 DBE Goals for this Project 3% Estimated Range between $5,000,001 to $10,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 2, 2b, 3, 3a or 5 The Principal Items of Work Consist of: Roadway Quantity Unit Description 315,867 Sy Micro Milling 257,420 Lf Polymerized Joint Adhesive 18,181 T High Performance Thin Overlay 111,785 Lf Micropaving Joints 111,785 Lf Rumble Strip 111,785 Lf Removal of Rumble Strip Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33 NJDOT: 109 - Pavement Preservation - Route 78 WB *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$5,069,491.00

Public - State/Provincial

Paving, Site Work

94

5

8

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
984
Active Projects
450
Bidding Soon
6,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 28, 2025

Project location map

I-78, Summit, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.