Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 22, 2025
Site work and new construction of a military facility in Altus, Oklahoma. Completed plans call for the construction of a military facility.
Provide three concrete pads for training. The bid package is structured for a base bid and two option bids. The Base bid includes a 90'x20' concrete pad for the structural props. Bid option one will be a 90'x40' pad for the auto extraction. Finally, the pad for housing the hazardous material will be Bid option two and will be 80'x30'. a. Insall silt fence. b. Strip vegetation to the depth required to remove roots and spread on site in a manner that does not disrupt the natural ground drainage. c. Excavate subgrade to depths required to achieve final elevations of the aggregate base course and the concrete pad surface. d. Water condition subgrade and compact to a 95% Standard Proctor Density. e. Install a 6 inch thick aggregate base course. Aggregate shall be compacted to achieve a solid surface free of pumping and when compaction is no longer noticeable when traversed with a minimum of an 8,000 lb, smooth drum, vibratory roller under a vibration load. f. Form concrete pads and install dowels and wire panels per drawings and specifications. g. 1/2 " diameter smooth dowels, 12 inches long shall be installed into existing pad, one foot on center. Drill 6 inches into the center of the existing pad. Grease one end of the dowel. Insert greased end of dowel and dowel cap into the existing pad. h. Install a five inch thick, 4,000 psi PCC mix. i. Pads shall have a slope of 1/4 inch per foot away as shown in the drawings. j. Testing of PCC shall comply with specifications. k. Concrete shall have a light broom finish. l. Backfill around pads. Use aggregate base material where slab access shall join aggregate driveways. Use excavated soils where backfill will ajoin vegetated areas. Backfill shall be gently graded a minimum distance of 5 feet to direct water away from the pad. Prevailing Wages Apply. Contract duration = 89 calendar days
Post-Bid
Military
$500,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
June 20, 2025
Multiple Locations, Altus, OK
Related To This Project
Altus, OK
Bid Date: Jun 23 2025
Altus, OK
Bid Date: Jun 27 2025
Altus, OK
Bid Date: Aug 13 2025
Altus, OK
Bid Date: Aug 08 2025
Altus, OK
Bid Date: Aug 29 2025
Altus, OK
Bid Date: Aug 12 2025
Altus, OK
Bid Date: Sep 11 2025
Altus, OK
Bid Date: Aug 29 2025
Altus, OK
Bid Date: May 30 2025
Altus, OK
Bid Date: May 22 2025
Altus, OK
Bid Date: May 15 2025
Altus, OK
Bid Date: May 30 2025
Altus, OK
Bid Date: Apr 21 2025
Altus, OK
Bid Date: Apr 24 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
