EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2025 at 8:00 PM

Updated May 22, 2025

Site work and new construction of a military facility in Altus, Oklahoma. Completed plans call for the construction of a military facility.

Provide three concrete pads for training. The bid package is structured for a base bid and two option bids. The Base bid includes a 90'x20' concrete pad for the structural props. Bid option one will be a 90'x40' pad for the auto extraction. Finally, the pad for housing the hazardous material will be Bid option two and will be 80'x30'. a. Insall silt fence. b. Strip vegetation to the depth required to remove roots and spread on site in a manner that does not disrupt the natural ground drainage. c. Excavate subgrade to depths required to achieve final elevations of the aggregate base course and the concrete pad surface. d. Water condition subgrade and compact to a 95% Standard Proctor Density. e. Install a 6 inch thick aggregate base course. Aggregate shall be compacted to achieve a solid surface free of pumping and when compaction is no longer noticeable when traversed with a minimum of an 8,000 lb, smooth drum, vibratory roller under a vibration load. f. Form concrete pads and install dowels and wire panels per drawings and specifications. g. 1/2 " diameter smooth dowels, 12 inches long shall be installed into existing pad, one foot on center. Drill 6 inches into the center of the existing pad. Grease one end of the dowel. Insert greased end of dowel and dowel cap into the existing pad. h. Install a five inch thick, 4,000 psi PCC mix. i. Pads shall have a slope of 1/4 inch per foot away as shown in the drawings. j. Testing of PCC shall comply with specifications. k. Concrete shall have a light broom finish. l. Backfill around pads. Use aggregate base material where slab access shall join aggregate driveways. Use excavated soils where backfill will ajoin vegetated areas. Backfill shall be gently graded a minimum distance of 5 feet to direct water away from the pad. Prevailing Wages Apply. Contract duration = 89 calendar days

Post-Bid

Military

$500,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
11
Bidding Soon
115
All Active Projects
55
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 20, 2025

img_map_placeholder

Multiple Locations, Altus, OK

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Task Order - Add CRF Fire Trainer B431PADS

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.