Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 14, 2025 at 8:00 PM
Updated June 15, 2025
Site work and paving for a mixed-use development in Corte Madera, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Hart Street Connector Path project aims to formalize an accessible path and improve multi-modal movements at the Palm Avenue/Hart Street/ Pepper Avenue intersection. The work includes demolition; traffic control; erosion and sediment control; tree removal; hot mix asphalt resurfacing and dikes; concrete curb and gutters, ADA compliant accessible ramps, sidewalks/flatwork, sidewalk underdrains, aggregate base, and subgrade preparation; new and retrofitted storm drain structures and corrugated HDPE installation; signing and striping for vehicles, pedestrians, and bicyclists; minor storm drainage system improvements; ground cover and planting; coordination with utility agencies for relocation and adjustment of rims and lids. Normal working hours are 8:00 AM to 5:00 PM, Monday through Friday, excluding holidays A certified check, or bid bond executed by an admitted surety insurer, for not less than ten percent (10%) of the proposal shall be submitted with each bid as a guarantee that the bidder, if awarded the Contract, will fulfill the terms of the bid. The certified check or bid bond shall be made payable to the Town of Corte Madera. All technical and administrative questions shall be directed to Demetre Copeland, (628) 253-1106, dcopeland@cortemadera.gov. For administrative questions or to be added to or request a copy of the plan holders list, email pwcounter@tcmmail.org Doc note: All interested contractors and those desired to be notified of any bid addenda, please submit request to Public Works at pwcounter@tcmmail.org to be added to the project's prospective bidder list. The Town of Corte Madera reserves the right to refuse any or all proposals or bids or portions thereof. The Town reserves the right to reject any or all bids, or to accept only a portion of certain items of the bid or to waive informalities in the bid. Question Deadline 05/16/2025
Award
Roads / Highways
$508,730.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2025
June 25, 2025
Hart St, Corte Madera, CA
Related To This Project
Corte Madera, CA
Bid Date: Jun 19 2025
Corte Madera, CA
Bid Date: Jun 12 2025
Corte Madera, CA
Bid Date: Jul 24 2025
Corte Madera, CA
Bid Date: Jul 18 2025
Corte Madera, CA
Bid Date: Sep 03 2025
Corte Madera, CA
--
Corte Madera, CA
Bid Date: Apr 08 2021
Corte Madera, CA
Bid Date: Oct 14 2025
Corte Madera, CA
Bid Date: May 05 2025
Corte Madera, CA
Bid Date: May 28 2025
Corte Madera, CA
Bid Date: May 05 2025
Corte Madera, CA
Bid Date: May 05 2025
Corte Madera, CA
Bid Date: Feb 28 2025
Corte Madera, CA
Bid Date: Aug 19 2025
Corte Madera, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
