EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2025 at 8:00 PM

Updated June 6, 2025

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000293264 Question Acceptance Deadline 23-May-2025 12:00:00 PM EDT Rail Life Optimization - Rail Grinding Program (i) The grinding contracting vendor is required to deliver the following designated Scope of Services for the Project for locations identified within Table 1: (a) Phase One: The Vendor will conduct a thorough validation of the consultant's assessments and perform supplementary inspections to identify gaps, reassess missed sections, and develop a comprehensive grinding plan to align with rail conditions. (b) Phase Two: The vendor will execute the grinding operations to restore rail profiles, address surface conditions and Rolling Contact Fatigue (RCF), and optimize rail performance using advanced equipment, while adhering to safety, environmental, and operational requirements. (c) Phase Three: The vendor will perform post-grinding inspections to ensure defects have been removed and profiles conform to requirements. Validate program success through quality assurance checks, Key Performance Indicator (KPI) monitoring, and final reporting to ensure long-term rail integrity and performance. (ii) General Requirements (Applicable to all Phases): (a) Preliminary Requirements: (i) Within two weeks of contract award, Metrolinx will schedule a kick-off meeting with the Vendor. During this meeting, the Vendor is required to present and provide a baseline schedule for the Detailed Project Plan. (ii) Within two weeks of contract award, the Vendor will prepare and submit comprehensive work plans. This submission should include the track access schedule, equipment specifications, safety documents, and associated documentation in Metrolinx Work Plan Methodology Template (attached along with this document) for thorough review by Metrolinx stakeholders at each stage of the work. In the event of comments from Metrolinx stakeholders, the Vendor is obligated to address and incorporate them. The Vendor must anticipate a review turnaround period of minimum ten (10) business days from the time of submission to the MX stakeholders. Final work plan approval is contingent upon adherence to Metrolinx Standards and Policies. (A) Vendor will follow the Metrolinx Network Access Planning Standards (NAPS) for access to the Rail Corridor. Metrolinx reserves the right to reject any or all Submissions at its sole discretion. Official bid documents must be obtained from www.metrolinx.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Transportation Terminals

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks, Special Trackwork
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Rail Vehicles, Locomotives
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
147
Bidding Soon
2,860
All Active Projects
1,150
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

img_map_placeholder

Multiple Locations, Toronto, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.