BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a mixed-use development in Port Angeles, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

All questions regarding the plans and specifications shall be submitted no later than Thursday, May 22nd, 2025, 2:00 pm PST, in writing or electronically to Ryan Jeffries, Project Manager, at rjeffries@cityofpa.us. The City of Port Angeles is accordance with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act, commits to nondiscrimination on the basis of disability, in all programs and activities. This material can be made available in an alternate format by emailing Ryan Jeffries at rjeffries@cityofpa.us or by calling 360-417-4811 The City of Port Angeles in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The City of Port Angeles is an equal opportunity and affirmative action employer. Small, minorityand women-owned businesses are encouraged to submit bids. All work performed on the project will be subject to the State of Washington prevailing wage rates. This Contract shall generally consist ofthe installation ofstormwater treatment vaults at the intersections of C, D and E Streets with 16th Street and includes, but is not limited to, demolition and reconstruction of the roadway with hot mix asphalt, cement concrete curbs and gutters, cement concrete curb ramps, catch basins, storm drainage manholes, stormwater pretreatment manhole, stormwater treatment vaults, and landscape restoration all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications. The Engineer's estimate is [$1,500,000- $1,900,000], The time of completion (performance period) is 60 working days. Posted Projects", "Public Works", "City of Port Angeles". Bidders are encouraged to "Register as a Bidder", in order to receive automatic email notification offuture addenda and to be placed on the "Bidders List". The City cannot be responsible for incomplete or non-responsive bids resulting from a failure to obtain complete, correct bid documents as published

Award

Roads / Highways

$1,189,028.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
135
Bidding Soon
2,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 28, 2025

Project location map

Multiple Locations, Port Angeles, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.