Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Renovation of a municipal facility in Price, Utah. Completed plans call for the renovation of a municipal facility.
Amendment P00001 - PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING The purpose of this amendment is to change the Period of Performance Dates from 06/16/2026 - 07/31/2025 to 07/07/2025 - 09/05/2025. Contract time is changed from 45 to 60 . All line items Period of Performance is 07/07/2025 - 09/05/2025. All other information remains the same. PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING SCOPE OF CONTRACT This project includes an electrical service and the electrical installation of lighting, receptacles, and equipment to the previously constructed Price Yard Fire Storage Building as described in the drawings. The Contractor will be responsible for coordinating installation of electrical and gas service and obtaining any and all permits and paying fees associated with the permits Overhead Door Operators - Providing and installing two overhead door operators with electrical circuits and controls. Heating System - Providing and installing a natural gas system with unit heater, electrical circuit and controls. Quantities for new utility lines are approximated. Lump sum quantities will be used for bidding. Prebid visit Advised. See attachments for more information. Project Title: Price Yard Fire Storage: Electrical and Heating The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete this project. Set Aside: Total Small Business Set-Aside (FAR 19.5) Magnitude: (b) Between 25,000 and 100,000. Location: See statement of work for location information. Period of Performance: 6/16/2025 to 7/31/2025 (45 Calendar ) Visit: A visit will be held on 5/21/2025 at 10:00am MT at location (895 N 1100 E, Price, UT 84501 Contractor s Due No Later Than 5/16/2025 at 1700 MT: . Use document titled "Contractor s and Answers Template" to write down your s and send it to terri.tuckerusda.gov. Period of Performance: 06/16/2025 to 07/31/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Municipal
$100,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
July 7, 2025
905 W 1100 S, Price, UT
Related To This Project
Price, UT
Bid Date: May 22 2025
Price, UT
Bid Date: Jun 04 2025
Price, UT
Bid Date: Aug 29 2025
Price, UT
Bid Date: Jun 12 2025
Price, UT
Bid Date: Jun 18 2025
Price, UT
Bid Date: Jun 12 2025
Price, UT
Bid Date: Jul 17 2025
Price, UT
Bid Date: May 13 2025
Price, UT
Bid Date: May 06 2025
Price, UT
Bid Date: Apr 16 2025
Price, UT
Bid Date: Apr 10 2025
Price, UT
Bid Date: Apr 15 2025
Price, UT
Bid Date: Apr 16 2025
Price, UT
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
