BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and paving for a civil project in Price, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Project includes the following Work: Abandonment and grouting in of existing storm drain beneath southeast building addition, installation of approximately 370 linear feet of 6-inch storm drain line, 154 linear feet of concrete waterway, 56 square yards of asphalt paving repair and related work. Completion date; The Work will be substantially completed on or before August 1, 2025 and completed and ready for final payment on or before August 8, 2024. Question deadline; Questions are due in writing to Daniel Hawley, PE at daniel.h@jonesanddemille.com on or before June 6, 2025. The Project is expected to be completed by August 1, 2025. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Owner may reject any or all bids submitted Bid date note - If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation BID ENCLOSED. A mailed Bid must be addressed to the location designated in the Advertisement. Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation. When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 14 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions. The Owner may reject any or all bids submitted.

Post-Bid

Water / Sewer

$85,500.00

Public - County

Paving, Site Work

8

17

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
22
Bidding Soon
295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

750 N Homestead Blvd, Price, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.