BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Remodeling of a municipal facility in Steamboat Springs, Colorado. Completed plans call for the remodel of a municipal facility.

Reference Number 0000386753 The City of Steamboat Springs is seeking a qualified Construction Manager/ General Contractor to provide construction remodel services for the Human Resources, Legal, and Municipal Court Offices located within Centennial Hall. Anticipated Notification of Award June 5, 2025 Question Deadline 05/20/2025 at 5:00 PM MT Questions are submitted online Yes - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City of Steamboat Springs expects that the successful proponent has carefully examined the plans prepared by Wagner Architects. The office spaces shall be constructed per plans & specs and adhere to all local authorities having jurisdiction, Community Development Code, and applicable sections of the Building Code as referenced on the contract documents. The Contractor will be responsible for but not limited to obtaining the required building permits, Inspections, demolition, waste removal, material procurement, construction, management of subcontractors, interfacing with city staff members, and mitigating any noise, dust, and or any indoor air quality concerns. Upon approval of the budget, City staff will obtain the required permits through the City Planning Department. The contractor will be responsible for the cost of the required county building permits as noted above. The scope will consist of demolishing existing carpet, wall base, walls as noted, millwork, ceiling tiles, light fixtures, door frames, doors, and hardware (hardware to be salvaged). New construction will include walls, millwork, carpet & base, ceiling tiles, ceiling grid modifications, doors, frames & hardware, lighting, mechanical, and the potential for a new Municipal Court Office. Please note that the Municipal Court Office shall be listed as an add alternate on the required price form. Contractor shall exclude costs for any new furniture. Contractor shall exclude costs to remove and relocate existing furniture.

Award

Municipal

$100,000.00

Public - City

Remodeling

12

3

2

6

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
26
Bidding Soon
212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

September 29, 2025

Project location map

124 10th St, Steamboat Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.