Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Renovation of a residential development in Melbourne, Florida. Completed plans call for the renovation of a residential development.

Melbourne Housing Authority to remove vinyl siding and to install hardie board planks in a total of (15) buildings at Temple Terrace in Melbourne, FL. Technical questions may be made prior to June 5th, 2025, at Bidderquestions@habc.us. Point of contact is Shawn Holtz at 321-294-2545. 1) Project Overview The Melbourne Housing Authority is seeking a qualified contractorto install new Hardie Plank Lap Sidingonto (14) apartment buildings and (1) recreation building. 2) Milestone and Deliverables a. Each building will require existing vinyl siding to be removed and disposed of by the contractor. b. Each building will be inspected by the Housing Authority after the vinyl siding is removed and prior to the installation of the new siding to ensure that there is no rotted wood. c. Each building will be finished before moving onto the next building. d. All Hardie Plank materials will be provided by the Housing Authority. e. It will be the contractor's responsibility to load and unload all materials from the location where the materials are stored. 3) Scope and Technical Details. a. All Hardi Planks used will be a size of 8 %" x 12' b. All planks will overlap each other by 1 %". c. All ends of planks must land on a stud. d. All ends of planks at butt joints must be the factory ends. e. Joint flashing will be installed behind every butt joint. f. Substrate consists of JPY2 in and/or % in plywood with wood studs. g. A waterproofing barrier will be applied over any bare wood areas if the existing barrier has deteriorated or is missing. h. Nailing method will be blind nailing (cannot see the nails) i. Nails must be .093 in. x .222 in. x 2 in. galvanized siding nail. j. Any plywood, studs, or framing that is deteriorated must be replaced. All costs associated with this added work will be in the form of a change order. k. It shall be the contractor's responsibility to verify existing conditions for each individual work item. The contractor shall be satisfied that there are no discrepancies between the actual conditions and the final scope of work as issued. Before ordering materials/products, the contractor shall verify related conditions to ensure proper application. Notify HABC immediately of any hidden condition discovered which might affect the progress of work. l. All work shall be performed during regular HABC hours, Monday through Friday, 7:00 AM - 5:30 PM. The contractor may be authorized to work evenings or weekends on a requested basis. m. Contractors should always provide a clean work site, including designated storage areas, free from accumulation of waste materials. In any case, materials shall not block or create obstacles for any person on the property. n. Each building will need to be properly coned, and caution taped to ensure the safety of all residents in the building and on the property. o. Contractor shall prepare and submit a schedule to the project manager identifying a work schedule for the week. p. All current applicable OSHA rules and regulations must always be followed. Security of the work site will be the responsibility of the contractor. q. Extreme care is always to be taken regarding the safety of the residents residing in the immediate and surrounding work areas. Extreme care must also be taken to prevent any damage to the buildings and automobiles. 4) Hardie Plank Installation Guide. > See Attachment 5) Management and Administration a. All work shall be completed in strict accordance with HABC's and HDD's procurement policies. All work is subject to, and shall comply with all Federal, State, and local government requirements, regulations, codes, guidelines, standards, and policies. b. All employees must be in compliance with Davis Bacon Labor Standards. c. All change orders must be approved before work can begin on that item. d. Change orders will be paid in an approved labor cost amount. e. A payment request can be made every two weeks. Payment amount will be determined by the amount of work that is completed to date of the request.

Post-Bid

Residential Subdivision

$130,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
103
Bidding Soon
1,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

1825 Temple Terrace, Melbourne, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.