Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 14, 2025 at 8:00 PM
Updated June 15, 2025
Site work for a water / sewer project in Bonifay, Florida. Completed plans call for site work for a water / sewer project.
Questions posted to this site before 5:00 P.M. (EST) on the seventh calendar day prior to the bid opening, or tenth calendar day prior to the December bid opening. The Improvements under this Work Document Driven Contract consist of reshaping ditches and reworking shoulders on SR 8 (US Interstate 10) in Holmes, and a portion of Washington Counties. These ditches are non-typical and should be re-graded to +/- 3 inches of the original flow line to create a free and unobstructed flow of drainage water. For the purposes of this contract, the original flow line is considered to be the linear projection along the ditch bottom between the invert elevations of immediately adjacent drainage structures. Spoil material removed from ditches and shoulders shall be relocated to FDOT storage pits in Caryville. Counties: Holmes, Washington Road Name: Ponce De Leon Maint - Shldr Rework and Ditch Reshaping Sr-8 Limits: Midpoint Project(s): 42214337262(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length:0.000 Miles Total Proposal Length: 0.000 Miles Contract Days: THRU 06/30/25 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Please read the full advertisement Description: The Improvements under this Work Document Driven Contract consist of reshaping ditches and reworking shoulders on SR 8 (US Interstate 10) in Holmes, and a portion of Washington Counties. These ditches are non-typical and should be re-graded to +/- 3 inches of the original flow line to create a free and unobstructed flow of drainage water. For the purposes of this contract, the original flow line is considered to be the linear projection along the ditch bottom between the invert elevations of immediately adjacent drainage structures. Spoil material removed from ditches and shoulders shall be relocated to FDOT storage pits in Caryville. Mobilization and Maintenance of Traffic are incidental to the pay items listed. This contract has a budgetary estimate of $569,714.00. Question Deadline 06/05/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 007 - Shoulder Work/Ditch Reshaping on SR 8 (US Interstate 10)
Post-Bid
Water / Sewer
$569,714.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
FL-8, Bonifay, FL
Related To This Project
Bonifay, FL
Bid Date: Jul 10 2025
Bonifay, FL
Bid Date: Jul 29 2025
Bonifay, FL
Bid Date: Jul 10 2025
Bonifay, FL
Bid Date: Jul 14 2025
Bonifay, FL
Bid Date: Aug 04 2025
Bonifay, FL
Bid Date: Sep 16 2025
Bonifay, FL
Bid Date: Oct 20 2025
Bonifay, FL
Bid Date: Nov 03 2025
Bonifay, FL
Bid Date: Jun 13 2025
Bonifay, FL
Bid Date: Jun 25 2025
Bonifay, FL
Bid Date: May 28 2025
Bonifay, FL
Bid Date: Apr 30 2025
Bonifay, FL
Bid Date: Apr 28 2025
Bonifay, FL
Bid Date: Mar 26 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
