BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2025 at 8:00 PM

Updated September 17, 2025

Demolition, site work, paving and new construction of a civil project in Bonifay, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and water / sewer project.

Counties: Holmes Road Name: Howell Williams Rd Limits: Over Ten Mile Creek, Bridge No 524150 Project(s): 44545615201(*) Federal Aid No: D324063B Total Roadway Length: 0.073 Miles Total Bridge Length: 0.017 Miles Total Proposal Length: 0.090 Miles Contract Days: 210 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Please read the full advertisement Description: The Improvements under this Contract consist of replacement of an existing bridge on Howell Williams Road over Ten Mile Creek bridge No. 524150. Other work includes drainage improvements, roadway reconstruction, asphalt turnout construction, guardrail updates and signing and pavement markings. The project is in Holmes County, 2 miles west of CR 177 and north of Bonifay R/W. Question Deadline 04/23/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 009 - Bridge Replacement - Howell Williams Rd

Award

Bridges / Tunnels

$2,250,788.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

76

7

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
27
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 30, 2025

Project location map

Howell Williams Rd, Bonifay, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.