Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work and paving for a civil project in S Glastonbury, Connecticut. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
This proposal suggests consideration of improvements to Dug Road over the middle gravel surfaced portion and the narrow and deteriorated lower portions in the form of pavement structure and storm drainage system installation. Past year projects have improved the lower westerly portion of the road and have included installation of an extensive, adequately sized drainage system which outlets to the CT River. Initial phase work would extend the drainage system and pave the gravel surfaced portion of the road with future phased work focused on widening of the upper easterly portion. Improvements envisioned would be context sensitive while providing a higher standard of road geometry and surface quality. If implemented, recurring maintenance efforts would be dramatically decreased and downstream impacts associated with intense precipitation events would be mitigated. Figures provided below assume design and permitting efforts by Town Engineering Division staff and construction by private contractor. As of May 16, 2025, this project is included in the Town of Glastonbury's Fiscal Year 2026-2030 CIP. Further information regarding a design firm and timeline for construction has not yet been established. Funding is allotted for FY 2029 and beyond. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,975,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2029
Dug Rd, S Glastonbury, CT
Related To This Project
S Glastonbury, CT
Bid Date: Mar 11 2025
S Glastonbury, CT
--
S Glastonbury, CT
--
S Glastonbury, CT
--
S Glastonbury, CT
Bid Date: Sep 22 2020
S Glastonbury, CT
Bid Date: Feb 23 2022
S Glastonbury, CT
--
S Glastonbury, CT
Bid Date: Aug 09 2022
S Glastonbury, CT
Bid Date: Nov 17 2022
S Glastonbury, CT
Bid Date: Nov 17 2022
Glastonbury, CT
--
Waterbury, CT
Bid Date: Jun 04 2025
Manchester, CT
Bid Date: Jun 03 2025
Westport, CT
Bid Date: Jun 05 2025
Stratford, CT
Bid Date: Aug 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
