Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Demolition, site work, paving and new construction of a mixed-use development in Bedford, Massachusetts. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; for the demolition of a municipal facility; for the construction of a municipal facility; and municipal facility.
Salt Shed Replacement Project :- Demolition of two salt and sand storage structures, construction of a new high arch gambrel salt shed with associated ground improvement, paving, construction of stormwater treatment measures, and the installation of lighting. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The estimated construction cost for the entire project is $2,500,000 Contract Award: July 2, 2025 Notice to Proceed Date: July 16, 2025 Substantial Completion Date November 14, 2025 Final Completion Date: December 15, 2025 1. Complete demolition of the Salt Shed and Material Storage buildings, above grade structures, and miscellaneous site features within the Limit of Work, as shown on the Contract Drawings . 2. Complete demolition of all sub-grade structures, including floors, slabs, foundations, footings/frost walls, and retaining walls within the Limits of Work as shown on the Contract Drawings, unless otherwise specified. 3. Complete demolition of all interior and exterior building elements and contents of building designated for demolition, including walls, ceilings, and roof structures. 4. Complete demolition of ancillary structures and their foundations, site features and items, including but not limited to concrete, ramps, stairs, concrete pads, existing fencing not being used to secure the site, curbing, miscellaneous improvements, and debris within the Limits of Work, even if the site features are not specifically shown on the Drawings. 5. Protection of stormwater and sewer utilities/structures not designated for demolition. 6. Removal and lawful disposal of miscellaneous debris and solid waste located within the Limits of Work indicated on the Drawings.
Award
Municipal
$2,505,960.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
September 2, 2025
108 Carlisle Rd, Bedford, MA
Related To This Project
Bedford, MA
Bid Date: May 30 2025
Bedford, MA
Bid Date: Jun 04 2025
Bedford, MA
Bid Date: Jun 10 2025
Bedford, MA
Bid Date: Jun 04 2025
Bedford, MA
Bid Date: May 27 2025
Bedford, MA
Bid Date: Jul 09 2025
Bedford, MA
Bid Date: Jul 01 2025
Bedford, MA
Bid Date: Jul 09 2025
Bedford, MA
Bid Date: May 14 2025
Bedford, MA
--
Bedford, MA
Bid Date: Jul 02 2020
Bedford, MA
Bid Date: May 15 2025
Bedford, MA
Bid Date: May 08 2025
Bedford, MA
Bid Date: May 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.