Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Demolition, site work, paving and new construction of a mixed-use development in Bedford, Massachusetts. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; for the demolition of a municipal facility; for the construction of a municipal facility; and municipal facility.

Salt Shed Replacement Project :- Demolition of two salt and sand storage structures, construction of a new high arch gambrel salt shed with associated ground improvement, paving, construction of stormwater treatment measures, and the installation of lighting. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The estimated construction cost for the entire project is $2,500,000 Contract Award: July 2, 2025 Notice to Proceed Date: July 16, 2025 Substantial Completion Date November 14, 2025 Final Completion Date: December 15, 2025 1. Complete demolition of the Salt Shed and Material Storage buildings, above grade structures, and miscellaneous site features within the Limit of Work, as shown on the Contract Drawings . 2. Complete demolition of all sub-grade structures, including floors, slabs, foundations, footings/frost walls, and retaining walls within the Limits of Work as shown on the Contract Drawings, unless otherwise specified. 3. Complete demolition of all interior and exterior building elements and contents of building designated for demolition, including walls, ceilings, and roof structures. 4. Complete demolition of ancillary structures and their foundations, site features and items, including but not limited to concrete, ramps, stairs, concrete pads, existing fencing not being used to secure the site, curbing, miscellaneous improvements, and debris within the Limits of Work, even if the site features are not specifically shown on the Drawings. 5. Protection of stormwater and sewer utilities/structures not designated for demolition. 6. Removal and lawful disposal of miscellaneous debris and solid waste located within the Limits of Work indicated on the Drawings.

Award

Municipal

$2,505,960.00

Public - City

Demolition, New Construction, Paving, Site Work

23

20

30

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
577
Active Projects
222
Bidding Soon
4,362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 2, 2025

Project location map

108 Carlisle Rd, Bedford, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.