Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Renovation of a mixed-use development in Lawrence, Kansas. Completed plans call for the renovation of a 4,465-square-foot educational facility.
Misc. upgrades to the existing theater at Multiple Middle Schools in Lawrence, KS. location LAWRENCE PUBLIC SCHOOLS LIBERTY MEMORIAL CENTRAL MIDDLE SCHOOL 1400 MASSACHUSETTS ST LAWRENCE, KS 66044 WEST MIDDLE SCHOOL 2700 HARVARD RD LAWRENCE, KS 66049 SOUTHWEST MIDDLE SCHOOL 2511 INVERNESS DR LAWRENCE, KS 66047 BILLY MILLS MIDDLE SCHOOL 2734 LOUISIANA ST LAWRENCE, KS 66046 Lawrence Public Schools serves approximately 10,646 students from pre-kindergarten through grade 12 in Lawrence, Kansas. Lawrence, a city with a population of 95,000, is located 45 minutes west of Kansas City and 30 minutes east of Topeka. The district is the seventh largest in Kansas and includes 23 school campuses and various specialized centers. The 23 school campuses, including an early childhood program (birth-age 5), 11 elementary schools (grades K-5), featuring the first public Montessori school in Kansas, four middle schools (grades 6-8), and two comprehensive high schools (grades 9-12). Additionally, we have the NSBA Award-Winning College and Career Center (grades 9-12), a K-12 virtual school, the Pinckney Community Connections Center for students ages 18-21, Adult Education Services (ages 18+), the Native American Support Services (NASS) building, the Facilities & Operations (F&O) campus, and the Educational Support Center (ESC). Work Covered by Contact Documents The work of the project is defined by the contract documents and consists of the following: 1) The project entails modifying existing theatrical equipment, generally in the areas of the existing performing arts auditoriums and stages. 2) Any adjacent areas damaged during construction, regardless of the cause, must be repaired or replaced to the satisfaction of the Design Team Representative and the Owner's Representative at no additional cost to the Project. 3) The buildings will remain occupied and operational throughout the construction within the building area. 4) Conflicting criteria should be identified/questioned at the pre-bid meeting or reported in writing to the Design Team Representative and the Owner's Representative for resolution before submitting bids. After bids are submitted and pricing is accepted, any subsequent discrepancies will be resolved in favor of the more stringent criteria. All bidders are advised to thoroughly review the complete project scope and actual project location before submitting their pricing.
GC Bidding
Educational
$170,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 9, 2026
Multiple Locations, Lawrence, KS
Related To This Project
Lawrence, KS
Bid Date: Jun 03 2025
Lawrence, KS
Bid Date: Jul 07 2025
Lawrence, KS
Bid Date: Jun 24 2025
Lawrence, KS
Bid Date: Jul 15 2025
Lawrence, KS
Bid Date: Jul 08 2025
Lawrence, KS
Bid Date: Jul 08 2025
Lawrence, KS
Bid Date: Jul 31 2025
Lawrence, KS
Bid Date: Jun 03 2025
Lawrence, KS
--
Lawrence, KS
--
Lawrence, KS
Bid Date: Jul 16 2025
Lawrence, KS
Bid Date: Apr 24 2025
Lawrence, KS
--
Lawrence, KS
Bid Date: Apr 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
