BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work and paving for a sidewalk / parking lot in Somerset, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sealed Bids for a paved extension to an existing paved parking lot at Parnell Prairie Preserve Park located at 1823 45th Street, Somerset, WI 54025. The area to be paved has been excavated and prepped with class 5 lime rock. It will require the successful bidder to: 1. Sawcut 83 feet along the eastern edge of the existing parking lot 2. Provide final grading of the area to be paved, ensuring drainage to the northeast corner of the parking lot. (Lot was prepped in fall of 2024 with a minimum of 6" class 5 base) 3. Provide and install asphalt 60 feet by 83 feet with 3" Hot Mix Asphalt (12.5mm) Mix (1 lift) Bidders' proof of insurance must be submitted to the Town upon acceptance of the Bid. Contractors on the project shall be required to comply with the laws of the State of Wisconsin Work to be completed by August 1, 2025, or date negotiated with Town Board upon acceptance of the Bid. The Town of Somerset reserves the right to reject any and all bids, to waive irregularities and informalities therein, and to award the contract in the best interests of the Town.

Award

Sidewalks / Parking Lot

$19,368.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

July 4, 2025

Project location map

1823 45th St, Somerset, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.