BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Renovation of a military facility in Hermiston, Oregon. Working plans call for the renovation of a military facility.

The Oregon Military Department ("OMD" "Owner" or "Agency") is seeking a Design-Build Contractor ("DBC" or "Design-Builder") to be a collaborative team leader in delivering the complete and usable Project on-time and within budgetary constraints in support of the ongoing mission of the ORARNG, by providing Project management, design, review, value engineering, testing, inspections, and construction of improvements to the existing Field Maintenance Shop #8 (the Project) located within Rees Training Center. The Project consists of sustainment, restoration and modernization of an existing 21,000 square foot National Guard building which supports the current logistical requirements for the ORARNG. FMS #8 has been newly authorized to service all motorized vehicles up to and including the M1A2SEPv3 tank. FMS #8 currently has 5,250 square feet of Heated Vehicle Work/Storage and 15,750 square feet of covered storage. The completed Project will provide adequate space for full-time and traditional (part-time) Oregon Army National Guard personnel. OMD's goals for this Project include extending the useful life of the facility by a minimum of an additional 25 years, implementation of cost-effective energy conserving measures, achieving code compliance, and utilizing existing building square footage. 1) Priority 1- Energy Efficiencies (Replace existing metal siding and roofing/add insulation, replace and update HVAC and exhaust ventilation in existing 3 work bays) 2) Priority 2 - Optimize use of existing space (Enclose additional bays, maximize workspace, design and construction of administrative offices, locker-room, and restrooms. 3) Priority 3 - Meet mission requirements (Addition of a 10-ton crane w/2 bays of operation) 4) Priority 4 - Meet mission requirements (Design and construction of one (1) enclosed hot wash rack connected oil/water separator) Question Deadline 05/28/2025 at 10:00 AM PT Shortlist Confirmed.

Final Planning

Military

$750,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

February 10, 2026

Project location map

78798 Ordnance Rd, Hermiston, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.