Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 8, 2025 at 8:00 PM
Updated October 9, 2025
Site work and new construction of an educational facility in Hermiston, Oregon. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Bids received after the time fixed for opening will not be considered. The First-Tier Subcontractor Disclosure Form must be submitted in a separate envelope within two (2) business hours after the advertised bid closing time. BID DOCUMENTS FOR CONTRACTORS: Electronic bid documents are available at oregonbuys.gov. Prospective Bidders must frequently check this webpage for any addenda, notices, or other updates regarding the Solicitation. No bid shall be considered unless the bid contains a statement by the bidder, as part of the bid, that the provisions required by ORS 279C.800 through ORS 279C.870 (workers on public works to be paid not less than prevailing rate of wage). All questions and comments about this solicitation must be directed ONLY IN WRITING to: katie.saul@hermistonsd.org prior to Thursday, August 28, 2025, 2:00 PM. The current wage rates applicable to this project are published in the July 5, 2025 Prevailing Wage Rate Book and associated relevant 2025 Prevailing Wage Rate Amendments if any. No bid will be considered unless accompanied by certified check, cashier's check, or bid bond made payable to Hermiston School District 8R in an amount equal to ten percent (10%) of the Basic Bid. Interest will not be allowed on bid security. It shall be understood and mutually agreed by and between the Contractor and Owner that the date of beginning and time for completion of the project are essential conditions of the contract and that the time for beginning and completion of the project shall be considered by the Owner in awarding the contract. No bidder may withdraw his/her bid after the hour set for the opening thereof, or thereafter, before award of the contract, unless award is delayed for a period exceeding thirty (30) days from the Bid Opening date. All questions and comments about this solicitation must be directed ONLY IN WRITING to: katie.saul@hermistonsd.org prior to Thursday, August 28, 2025, 2:00 PM. The Owner reserves the right to waive any irregularities in the bids, to cancel the procurement, to reject any or all bids, and to accept only such bids as may be in the Owner's best interest. Estimated cost range is $225,000 - $275,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Educational
$490,800.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
September 11, 2025
600 S 1st St, Hermiston, OR
Related To This Project
Hermiston, OR
Bid Date: Aug 29 2025
Hermiston, OR
Bid Date: Sep 09 2025
Hermiston, OR
Bid Date: Sep 10 2025
Hermiston, OR
Bid Date: Oct 14 2025
Hermiston, OR
Bid Date: Nov 13 2025
Hermiston, OR
Bid Date: Aug 25 2025
Hermiston, OR
Bid Date: Aug 25 2025
Hermiston, OR
Bid Date: Jul 31 2025
Hermiston, OR
--
Hermiston, OR
Bid Date: May 27 2025
Hermiston, OR
Bid Date: Jun 10 2025
Hermiston, OR
Bid Date: Jun 10 2025
Hermiston, OR
Bid Date: May 09 2025
Hermiston, OR
Bid Date: May 06 2025
Hermiston, OR
Bid Date: Mar 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
