Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Site work for a playground / park / athletic field in New York, New York. Completed plans call for site work for a playground / park / athletic field.
Performance Period: 330 Continuous Calendar Days (See Page CC-3 and Appendix B Pursuant to the SCAs authorizing legislation, contracts will only be awarded to contractors prequalified by the SCA. Liquidated Damages: One Thousand ($1,000) Dollars per Continuous Calendar Day and as set forth in the Construction Contract Page 3 Questions Regarding the Current PLA Should Be Directed to Mayra Lopez, Director of Labor Law, at Email: Mlopez8@nycsca.org or Telephone Number: (718)472-8496 All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to rfimentor@nycsca.org using the project solicitation number in the subject line as indicated in the following example: RFIMENTOR 25-12345D-1 Smith and Jones Construction. Please send all Questions to rfimentor@nycsca.org. however, if you have any additional questions or issues please contact N. Bellingy, Contract Administrator at E-mail: nbellingy@nycsca.org or at Phone Number: (718)472-8188. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. This section applies to all work conducted in existing premises. This includes work that may generate dust and debris, work that disturbs painted surfaces assumed or known to be lead-based paint and/or that disturbs ballasts, light bulbs, batteries, Mercury Containing Equipment, electronics or other hazardous materials not specifically covered in other specifications. B. Furnish all labor, materials, equipment, and incidentals required to remove, handle, store, and dispose of all PCB containing and non-PCB containing ballasts, light fixtures, fluorescent bulbs as specified, as shown on the Drawings and Specifications and as directed by the Authority. Work shall be done in accordance with all applicable City, State and Federal laws and regulations and SCA protocols. C. Abate and dispose of all asbestos containing material (ACM) as specified in section 02081, as shown on the Drawings, and as directed by the Authority. Work shall be done in accordance with all applicable City, State and Federal laws and regulations and SCA protocols. D. Architectural and electronics wastes that would otherwise be hazardous waste due to metals (e.g., scrap metal with lead-based paint, computers) may only be recycled if the contractor meets the New York State Department of Environmental Conservation (NYSDEC) hazardous waste recycling regulations (e.g., 6 NYCRR 371.1(c)(7)) notification). The Contractor shall provide all labor, equipment and materials for performance of the Work in accordance with the Contract Documents. E. Unless the Authority provides information regarding the lead content of specific painted surfaces, all interior painted surfaces are assumed to contain leadbased paint. Manage all waste and wastewater as described in Articles 1.28 and 1.29, including determining if it is Toxicity Characteristic (e.g., lead containing) hazardous waste. F. This section shall be used in conjunction with other Specifications that also apply, notably where building - containing more than 50 parts per million (ppm) of Polychlorinated Biphenyls (PCBs). 1. Where painted caulk, light fixture or ballast wire insulation or other building materials being removed is also an Asbestos Containing Material (ACM), follow applicable provisions of both Specification 02081 and this specification. 2. Where painted caulk being removed is also a PCBcontaining caulk, follow applicable provisions of both Specification 02082 and this specification. G. Domestic potable water disinfection and testing are required for all projects involving the potable water systems. Assistance in the collection of lead in water samples is also required. For projects involving the potable water system resulting from a change of scope or field modification, consult IEH HazMat for appropriate direction on how to proceed.
Award
Playgrounds / Parks / Athletic Fields
$595,635.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
July 3, 2025
91-30 Metropolitan Ave, New York, NY
Related To This Project
New York, NY
Bid Date: May 28 2025
New York, NY
Bid Date: Jun 05 2025
New York, NY
Bid Date: Jun 10 2025
New York, NY
Bid Date: Jun 13 2025
New York, NY
Bid Date: Jun 11 2025
New York, NY
Bid Date: Jun 06 2025
New York, NY
Bid Date: Jun 02 2025
New York, NY
Bid Date: May 30 2025
New York, NY
Bid Date: Jun 03 2025
New York, NY
Bid Date: Jun 03 2025
New York, NY
Bid Date: Jun 04 2025
New York, NY
Bid Date: Jun 02 2025
New York, NY
--
New York, NY
Bid Date: Jun 05 2025
New York, NY
Bid Date: Jun 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
