Site work for a civil project in East Palo Alto, California. Conceptual plans call for site work for a water / sewer project.

Question Deadline 05/30/2025 at 5:00 PM PT Questions regarding the information in this Request for Proposals package must be submitted in writing via email addressed to Michael Cortez at mcortez@cityofepa.org. The City of East Palo is seeking proposals from qualified professionals for the design of the O'Connor Pump Station Underground Diesel Storage Tank Piping Upgrades project. Project Background The O'Connor Pump Station, located in the southeast portion of the City of East Palo Alto, is responsible for draining the majority of the City's storwmater discharge. This discharge is conveyed by four diesel-driven axial flow pumps and a single electric motor-driven low flow pump. The four diesel-driven pumps are supplied diesel via underground fuel supply lines from a 2,000-gallon underground storage tank. The primary objective of this project is to upgrade the existing underground fuel supply lines for the diesel-driven pumps. The O'Connor Pump Station is enclosed in a concrete masonry unit (CMU) structure located on the San Francisquito Creek Levee in the southeast portion of the City, as shown in Figure 1: Vicinity Map below. The pump station, which was constructed in 1984 by the County of San Mateo, currently serves as the City's only pump station and is responsible for draining the majority of the City's stormwater discharge. Stormwater flow through this pump station is conveyed by four diesel-driven axial flow pumps and a single electric motor-driven low flow pump. The four diesel-driven pumps are supplied diesel from a 2,000-gallon underground storage tank located at the southeast corner of the site. The underground fuel supply lines for these diesel-driven pumps are made of single-walled steel pipe. The primary objective of this project is to upgrade the existing underground fuel supply lines for the diesel-driven pumps at the O'Connor Pump Station. The current fuel lines, which are made of single-walled steel, will need to be removed & replaced with double-walled piping with the ability to monitor the secondary piping in the event that there is a leak from the primary piping via a piping sump. Through these underground diesel storage tank piping improvements, the City aims to ensure that the underground diesel storage tank and all associated piping appurtenances are in accordance with California Senate Bill 445 (SB 445) by December 31, 2025. Question Deadline 05/30/2025 at 5:00 PM PT Questions regarding the information in this Request for Proposals package must be submitted in writing via email addressed to Michael Cortez at mcortez@cityofepa.org.

Conceptual

Water / Sewer

$970,000.00

Public - City

Site Work

3

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
166
Bidding Soon
2,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

Project location map

Multiple Locations, East Palo Alto, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.