Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Site work for a water / sewer project in Everett, Washington. Completed plans call for site work for a water / sewer project.
**As of November 26th, 2025, the project was awarded to Absher/Stellar J Joint Venture with an awarded amount of $104,860,670.13.** The City of Everett Port Gardner Water Quality Program serves to improve water quality in the Possession Sound and Port Gardner Bay by reducing combined sewer overflows and providing regional storm water treatment for more than 200 acres of urban watershed. The PGSF will provide temporary combined sewer storage, reducing CSOs at the City's four remaining uncontrolled CSO discharge points to meet the Washington State Department of Ecology executed Agreed Order number 11638.This facility will also provide stormwater treatment for separated stormwater drainage basins with conveyance to the City's deepwater outfall and local stormwater conveyance to the Everett Water Pollution Control Facility. Construction of the PGSF involves retrofit of the project site through installation of combined sewer and stormwater infrastructure. This includes, but is not limited to, buried conveyance pipelines, construction of two green field pump stations, rehabilitation of the existing aeration basins and secondary clarifiers, installation of a ground stabilizing buttress wall, pre-cast and cast in place vaults, architectural improvements made to existing buildings, installation of electrical systems, instrumentation and controls, and pile supports for new and existing structures. This work also involves all facility commissioning and start-up activities. a bid bond or certified check or cashiers check in an amount not less than five percent (5%) of the total amount of the bid/proposal, all in accordance with the bidding documents. A one hundred percent (100%) performance bond (and a one hundred percent (100%) payment bond, as may be required in the bidding documents), on form(s) provided by the City, will be required of the successful bidder to guarantee faithful performance of the contract. Construction of the PGSF is planned to commence in August 2025 and must be operational by December 31, 2027, The City reserves the right to reject any and all bids and to waive any irregularities or informalities Question Deadline 06/24/2025 All requests for interpretations must be received by the City or Engineer. Questions and inquiries about these Contract Documents should be directed in writing to the attention of Zach Brown at zbrown@everettwa.gov. Bid Opening Notes: At the appointment time, all bids will be opened at the Procurement Office on the 9th floor and read aloud publicly via live streaming. Interested parties are encouraged to watch via live streaming, however, bidders may also attend the bid opening in person.
Award
Water / Sewer
$104,860,670.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
November 21, 2025
2200 W Marine View Dr, Everett, WA
Related To This Project
Everett, WA
Bid Date: Jun 05 2025
Everett, WA
Bid Date: Jun 12 2025
Everett, WA
Bid Date: Jun 24 2025
Everett, WA
Bid Date: Jul 24 2025
Everett, WA
Bid Date: Jun 24 2025
Everett, WA
--
Everett, WA
Bid Date: Jun 18 2025
Everett, WA
Bid Date: Jun 17 2025
Everett, WA
Bid Date: May 27 2025
Everett, WA
Bid Date: Jun 05 2025
Everett, WA
Bid Date: Jun 03 2025
Everett, WA
Bid Date: Dec 05 2025
Everett, WA
Bid Date: Jun 03 2025
Everett, WA
Bid Date: Jun 04 2025
Everett, WA
Bid Date: Jun 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
