BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Renovation of a stadium in Everett, Washington. Completed plans call for the renovation of a stadium.

**As of August 25, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Angel Of The Winds Arena Elevator Modernization Everett Events Center, owned by the Everett Public Facilities District and operated on its behalf by OVG360 invites responses to this Request for Proposal (RFP) from qualified vendors for the Elevator Modernization of Elevator 2. Project Scope: Modernization of Elevator 2 Capacity - 10,000 lbs. o Speed - The current configuration is 100 fpm but we're requesting a custom engineered and fabricated power unit installed to increase speed 40% to achieve 140 fpm. o Stops and openings - 3 Front, 1 Rear o Travel - approximately 40'-0'' o Shaft - Retain existing o Voltage -480 VAC 3ph 60 cy o Controller - Replace existing with a new Non-Proprietary hydraulic controller, serial communications with devices. Features will include fire recall, independent service, hoistway access and car top operation. o Hydraulic and mechanical equipment -Replace pump unit (motor controls must be soft start style) and install Overspeed Valve. retain all other existing equipment, including guide rails, rail brackets, car sling, platform, buffers, hydraulic pipe, shut off valves, jack, piston, and casing. o Cab - Retain existing shell and doors. o Door Equipment - Replace existing operator with new GAL door equipment with code required gate restrictor, replace tracks and hangers, replace pickup assembly, closer and clutch. Provide new light curtain. o Entrances - Retain existing. o Fixtures- Replace existing with Innovation Industries code compliant fixture package. o Wiring - Install new hoistway and car wiring to integrate with new controller. Re-use existing piping as much as possible. o Warranty - Provide 12 months material and craftsmanship All communication should be sent to: Corey Margolis - General Manager, Angel Of The Winds Arena - Oak View Group | Corey.Margolis@oakviewgroup.com Curtis Giboney - Technical & Special Projects Manager, Angel Of The Winds Arena - Oak View Group | Curtis.Giboney@oakviewgroup.com Mark Clark - Chief Engineer, Angel Of The Winds Arena - Oak View Group | Mark.Clark@oakviewgroup.com June 4, 2025, Last day for clarification questions

Post-Bid

Arenas / Stadiums

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
108
Bidding Soon
1,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

2000 Hewitt Ave, Everett, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.