BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work for a water / sewer project in Omaha, Nebraska. Completed plans call for site work for a water / sewer project.

The Work Consists Essentially of the Following Estimated Quantities: Approximate Quantities Description Quantity Unit Install Silt Fence 1,000.00 Lf Install Construction Entrance 1.00 Each Install Concrete Washout 1.00 Each Clearing and Grubbing - General 1.00 Ls Adjust Utility Manhole to Grade 1.00 Each Construct Aggregate Bedding for Type F3, 6 Sanitary Sewer Pipe (Sewer Service) 8,500.00 Lf Construct Aggregate Bedding for Type F3, 8 Sanitary Sewer Pipe 13,080.00 Lf Construct Aggregate Bedding for Trench Stabilization 150.00 Ton Construct Foundation Rock for Trench Stabilization 150.00 Ton Construct Trench Excavation (Unsuitable Material) 300.00 Cy Construct 6 Sanitary Sewer Pie 8,500.00 Lf Construct 8 Sanitary Sewer Pipe 13,080.00 Lf Construct 6 X 8 Wye 203.00 Each Construct 54 Id Sanitary Manhole (55) 710.00 Vf Provide External Frame Seal to Paving Contractor 55.00 Each Perform Cctv Pipeline Inspection 13,080.00 Lf Perform Cctv Pipeline Inspection (Post 30 Days) 13,080.00 Lf Clean Sanitary Sewer Pipe 13,080.00 Lf Clean Sanitary Sewer Pipe (Post 30 Days) 13,080.00 Lf Construct Connection to Existing Manhole 1.00 Each Install Seeding - Type Native Seed 5.00 Acre Nstall Rolled Erosion Control, Type Iii W/ Seeding 1,000.00 Sy Mobilization/ Demobilization 1.00 Ls Storm Sewer Remove 15 to 18 Sewer Pipe 120.00 Lf Remove Flared End Section (Less Than 24) 1.00 Each Remove Rip Rap 30.00 Ton Construct Aggregate Bedding for Trench Stabilize 250.00 Ton Construct Foundation Rock for Trench Stabilization 250.00 Ton Construct Trench Excavation (Unsuitible Material) 125.00 Cy Construct 18 Rc Flared End Section 2.00 Each Construct 24 Rc Flared End Section 1.00 Each Construct 30 Rc Flared End Section 2.00 Each Construct 48 Rc Flared End Section 1.00 Each 54 Rc Flared End Section 1.00 Each Construct 54 Id Storm Manhole (17) 97.50 Vf Construct 72 Id Storm Manhole (2) 13.00 Vf Construct 96 Id Storm Manhole (3) 20.80 Vf Perform Cctv Pipeline Inspection (Post-construction) 9,097.00 Lf Clean Storm Sewer Pipe Post Construction 9,097.00 Lf Construct Type C Rip-rap 200.00 Ton. a bid bond or a certified check in the amount not less than $125,000.00 Sanitary and Improvement District 638 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities

Bid Results

Water / Sewer

$2,580,980.00

Public - County

Site Work

49

8

6

13

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
89
Bidding Soon
833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

August 1, 2025

Project location map

Multiple Locations, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.