Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Site work for a water / sewer project in Omaha, Nebraska. Completed plans call for site work for a water / sewer project.
The Work Consists Essentially of the Following Estimated Quantities: Approximate Quantities Description Quantity Unit Install Silt Fence 1,000.00 Lf Install Construction Entrance 1.00 Each Install Concrete Washout 1.00 Each Clearing and Grubbing - General 1.00 Ls Adjust Utility Manhole to Grade 1.00 Each Construct Aggregate Bedding for Type F3, 6 Sanitary Sewer Pipe (Sewer Service) 8,500.00 Lf Construct Aggregate Bedding for Type F3, 8 Sanitary Sewer Pipe 13,080.00 Lf Construct Aggregate Bedding for Trench Stabilization 150.00 Ton Construct Foundation Rock for Trench Stabilization 150.00 Ton Construct Trench Excavation (Unsuitable Material) 300.00 Cy Construct 6 Sanitary Sewer Pie 8,500.00 Lf Construct 8 Sanitary Sewer Pipe 13,080.00 Lf Construct 6 X 8 Wye 203.00 Each Construct 54 Id Sanitary Manhole (55) 710.00 Vf Provide External Frame Seal to Paving Contractor 55.00 Each Perform Cctv Pipeline Inspection 13,080.00 Lf Perform Cctv Pipeline Inspection (Post 30 Days) 13,080.00 Lf Clean Sanitary Sewer Pipe 13,080.00 Lf Clean Sanitary Sewer Pipe (Post 30 Days) 13,080.00 Lf Construct Connection to Existing Manhole 1.00 Each Install Seeding - Type Native Seed 5.00 Acre Nstall Rolled Erosion Control, Type Iii W/ Seeding 1,000.00 Sy Mobilization/ Demobilization 1.00 Ls Storm Sewer Remove 15 to 18 Sewer Pipe 120.00 Lf Remove Flared End Section (Less Than 24) 1.00 Each Remove Rip Rap 30.00 Ton Construct Aggregate Bedding for Trench Stabilize 250.00 Ton Construct Foundation Rock for Trench Stabilization 250.00 Ton Construct Trench Excavation (Unsuitible Material) 125.00 Cy Construct 18 Rc Flared End Section 2.00 Each Construct 24 Rc Flared End Section 1.00 Each Construct 30 Rc Flared End Section 2.00 Each Construct 48 Rc Flared End Section 1.00 Each 54 Rc Flared End Section 1.00 Each Construct 54 Id Storm Manhole (17) 97.50 Vf Construct 72 Id Storm Manhole (2) 13.00 Vf Construct 96 Id Storm Manhole (3) 20.80 Vf Perform Cctv Pipeline Inspection (Post-construction) 9,097.00 Lf Clean Storm Sewer Pipe Post Construction 9,097.00 Lf Construct Type C Rip-rap 200.00 Ton. a bid bond or a certified check in the amount not less than $125,000.00 Sanitary and Improvement District 638 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities
Bid Results
Water / Sewer
$2,580,980.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
August 1, 2025
Multiple Locations, Omaha, NE
Related To This Project
Omaha, NE
Bid Date: May 27 2021
Omaha, NE
Bid Date: Feb 04 2021
Omaha, NE
Bid Date: Oct 27 2021
Omaha, NE
Bid Date: Aug 26 2020
Omaha, NE
Bid Date: Feb 04 2021
Omaha, NE
Bid Date: Oct 06 2021
Omaha, NE
Bid Date: Nov 23 2021
Omaha, NE
Bid Date: Jun 24 2025
Omaha, NE
Bid Date: Jun 05 2025
Omaha, NE
Bid Date: May 30 2025
Omaha, NE
Bid Date: Jun 04 2025
Omaha, NE
Bid Date: Jul 09 2025
Omaha, NE
Bid Date: Jun 11 2025
Omaha, NE
Bid Date: May 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
