BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Site work and paving for a mixed-use development in Davenport, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Davenport is accepting bids for the Kimberly Downs Road and Bridge Avenue Reconstruction Project. This project is located along Kimberly Downs Road from Bridge Avenue to E 33rd Street and along Bridge Avenue from Kimberly Road to Kimberly Downs Road. The proposed improvements include, but are not limited to, the furnishing of all labor for the removal of the PCC roadway for the length of the project, full depth aggregate stone base material, geo fabric / grid materials if needed, reconstruction of the roadway with a PCC rigid pavement section, reset all existing utility surface features to finish grade, replacement of the adjacent driveway approaches, reconstruction of sidewalk at the intersections including ADA ramp construction, topsoil and seeding, and erosion control. Bids must be submitted through the City of Davenport e-bidding system (https://davenport.ionwave.net); no emails, faxes, paper copies or any other submission method will be accepted. Within the system, each tab of the Invitation to Bid must be reviewed and responded to accordingly. Question Deadline 05/28/2025 at 10:00 AM CT Question Cut Off Date For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - The Contractor shall complete all work, including final cleanup and removal of all equipment for the bid by October 15, 2025 unless modified by change order. Liquidated Damages - Liquidated damages shall be $1000.00 per day The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so.

Award

Roads / Highways

$926,680.00

Public - City

Paving, Site Work

87

3

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
88
Bidding Soon
1,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

August 11, 2025

Project location map

Kimberly Downs Rd & Bridge Ave, Davenport, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.