BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work and paving for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of July 21,2025, the project was awarded to Eastern Iowa Excavating & Concrete, LLC, with an awarded amount of $369,927.50.** W 56th Street Reconstruction Hillandale Road to 2519 W 56th Street. The proposed improvements include, but are not limited to, the furnishing of all labor for the removal of the PCC roadway for the length of the project, full depth aggregate stone base material, geo fabric / grid materials if needed, reconstruction of the roadway with a PCC rigid pavement section, reset all existing utility surface features to finish grade, replacement of the adjacent driveway approaches, reconstruction of sidewalk at the intersections including ADA ramp construction, topsoil and sodding, and erosion control. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - It is expected that the site will be available by August 1, 2025. The Engineer will inform the Contractor of any delay and if possible, the duration of the delay. The Contractor may commence work, weather and specifications permitting, any time after execution of the contract, after receipt of the Notice to Proceed, and on or after the approximate start date provided the site is available. The Contractor shall complete all work, including final cleanup and removal of all equipment for the bid within 50 Working Days. Liquidated Damages - Liquidated damages shall be $1000.00 per day The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. Question Cut Off Date 5/29/2025 09:00:00 AM (CT)

Award

Roads / Highways

$369,928.00

Public - City

Paving, Site Work

28

5

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
82
Bidding Soon
1,143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

August 1, 2025

Project location map

W 56th St, Davenport, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.