BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of a fire / police facility in Lakeport, California. Completed plans call for the renovation of a fire / police facility.

This is a Prevailing Wage project, as such, all bidders are required to meet the requirements as set forth in California relating to Prevailing Wage projects, including documentation and reporting. Project: Roof replacement including complete tear-off of existing roofing materials (tear- off), removal of all materials from site with proper disposal; replacement of any damaged components, including but not limited to sheeting, insulation, framing, etc.; re-roof per manufacturers specifications of roofing material and products being applied. Required to use all new materials. Factory seconds are not permitted to be used. Option: Roof replacement including complete tear-off of existing roofing materials (tear- off), removal of all materials from site with proper disposal; replacement of any damaged components, including but not limited to sheeting, insulation, framing, etc.; truss roof construction over all flat roof and low-slope areas; re-roof per manufacturers specifications of roofing material and products being applied. Required to use all new materials. Factory seconds are not permitted to be used. Permits: Bidder / Contractor is responsible for all permits and inspections as required by the City of Lakeport. Warranty: Bidder / Contractor required to provide 25-year warranty for all labor and materials. Pricing Guarantee: Bidder / Contractor required to guarantee pricing for a minimum of 90 days after bid opening. Bid Bond: Bidder / Contractor required to post 10% Bid Bond or Cashiers Check. Delivery: Bidder / Contractor to provide an estimated time of completion (start to finish) of the project. References: Bidder / Contractor to provide a minimum of three (3) completed Prevailing Wage project references. License and Insurance: Bidder / Contractor to provide proof of current license and insurance All questions are to be directed in writing to Patrick Reitz, Fire Chief at: preitz@lakeportfire.com

Post-Bid

Fire / Police

$189,528.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
74
Bidding Soon
665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 18, 2025

Project location map

445 N Main St, Lakeport, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.