BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a mixed-use development in Antigo, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Solicitation Id: NC-02 The sections of pavement need replacement or resurfacing to extend the facilitys service life. 1602-11-01: Perpetuation project to replace the pavement of approximately 1.601 miles of USH 45 from CTH G to CTH Y in the town of Antigo in Langlade County. Replace the pavement with a 3-lane roadway with a two-way left turn lane (TWLTL) consisting of two 12-foot lanes, one 14-foot TWLTL, and 8-foot shoulders (5- foot paved, 3-foot gravel). Additional improvements include cross culvert replacements, storm sewer adjustments, spot curb & gutter replacements, and replacement of the existing structure, B-34-0053, over the drainage way. 1602-11-02: Perpetuation project to resurface approximately 0.542 miles USH 45 from CTH Y to Spring Brook Bridge in the city of Antigo in Langlade County. Resurface the pavement with a 4 mill and 4 overlay of asphalt. Additional improvement include spot replacement of curb and gutter, investigate and reconstruct curb ramps to meet current ADA compliance, evaluate inlets for repair or replacement, and signal installation at USH 45 and CTH Y intersection. Several alternatives for USH 45 & 10th Ave intersection need to be evaluated and taken through public involvement process including a 3-lane Two-way Left Turn Lane (TWLTL) configuration alternative (2-12 lanes, 14' TWLTL, 5 urban shoulders); a Two-Way Stop Control alternative; a Right-In/Right-Out/Left-In access modification alternative; and a Close/Consolidate Access alternative. Anticipated Construction Cost: $6,000,000-$6,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 09/01/2025 Anticipated Project Completion Date: 06/01/2032 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Wittenberg - Antigo - USH 045 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$6,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
69
Bidding Soon
501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

US-45, Antigo, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.