Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work, paving and new construction of an educational facility in Antigo, Wisconsin. Completed plans call for the construction of a 116,000-square-foot, two-story above grade educational facility; for site work for a educational facility; and for paving for a educational facility.

The Unified School District of Antigo is undertaking the construction of a new, state-of-the-art elementary school located on Western Avenue in Antigo, Wisconsin. This two-story, 116,000-square-foot facility will serve grades K-4 and is designed to support modern educational needs with a focus on safety, sustainability, and community integration. The building will feature load-bearing masonry construction with steel framing, standing seam metal and EPDM membrane roofing, and a durable exterior of concrete stone veneer, brick, and metal panel siding. All interior partitions will be constructed of masonry for enhanced durability and sound control. Project Description: A new+/-116,000 s.f. two-story slab on grade elementary school. The building will be all loadbearing masonry construction, with standing seam metal and EPDM membrane roofing over steel deck and barjoist framing. Exterior cladding will be concrete stone veneer, brick veneer, and metal plank wall panel siding. All interior partitions will be masonry During the Bidding Phase, all questions are to be directed to: 1. Steve Romatz, Project Manager 2. sromatz@bluedesigngroupllc.com 3. (920) 572-2583

Post-Bid

Educational

$10,000,000.00

Public - City

New Construction, Paving, Site Work

186

29

42

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
31
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 1, 2025

Project location map

Multiple Locations, Antigo, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed