Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 28, 2025 at 8:00 PM
Updated June 7, 2025
Site work, paving, new construction and renovation of a mixed-use development in Arlington Heights, Illinois. Completed plans call for the construction of a 9,850-square-foot playground / park / athletic field; for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project involves work for Phase 2 and 3 at Recreation Park in Arlington Heights located at 500 & 501 E Miner Street, Arlington Heights, IL 60004. Phase 2 includes site work demolition, earthwork/mass grading, and infrastructure improvement for utility services. Also included is the installation of various site improvements including new parking lot, walkways, basketball courts, restroom building, new backstop sports netting, and improvements to the baseball field and amenities. Phase 3 includes site work demolition, complete demolition of existing pools and locker room building, earthwork/mass grading, and infrastructure improvements. New construction includes additions and renovations to the Community Building and a new 9,850 SF Bathhouse. Also included is a new 50- meter lap pool, wading pool, deck areas, and associated site amenities and improvements. A Bid Bond or Certified Check in the amount of 10% of the bid made out to Arlington Heights Park District is to accompany the Bid Form. The successful bidder must furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to 100% of the bid amount, with sureties approved by the owner, and Certificate of Insurance within ten (10) days of the award of the contract. All Performance and Payment Bonds will be in accordance with the requirements stated in the AIA 232 General Conditions. A Pre-Bid Meeting is currently not scheduled for this project and should not be required. Please email all questions to Tom McGrath (tmcgrath@lampinc.net) at Lamp Incorporated. If the bidding contractors feel it would be beneficial to have a Pre-Bid Meeting, it will be scheduled at a later date. The successful bidder is required to pay Prevailing Wage for work under this Contract and shall submit certified payroll records in compliance with the Prevailing Wage Act (820 ILCS 130/1-12). The Contractor(s) selected will also be required to comply with all applicable federal, state, and local laws, rules, regulations, and executive orders, including but not limited to those pertaining to equal employment opportunities. The Board of Commissioners of Arlington Heights Park District reserves the right to reject any and all proposals or waive any bid irregularities. The Arlington Heights Park District encourages minority business firms and Contractor's complying with the Illinois Apprenticeship Initiative to submit bids on this project. The successful contract bidder is encouraged to utilize minority businesses and those complying with the Illinois Apprenticeship Initiative as sub-contractors for supplies, equipment, services, and construction This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Land Acquisition & Development" (OSLAD) grant program. This project is being financed, in part, with funds from the State of Illinois, "Park and Recreation Facility Construction" (PARC) grant program. Minority business firms are encouraged to submit bids on the approved project. The successful contract bidder is encouraged to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. ** bid date info : Bids must be submitted in duplicate in a sealed envelope and labeled "Arlington Heights Park District - Recreation Park - Phase 2 and Recreation Park Community Building Renovation and New Pool & Bathhouse (Phase 3), the Date and Time of the Bid Opening, the Contractor's Name and Address, and their Trade Package. All Contractors shall use the bid day label provided with their Bid Form
Post-Bid
Playgrounds / Parks / Athletic Fields
$14,900,000.00
Public - City
New Construction, Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2025
July 7, 2025
500 E Miner St, Arlington Heights, IL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
