BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 14, 2025

Demolition, site work, renovation and addition to a power facility in Middleborough, Massachusetts. Completed plans call for the addition of a power facility; for the demolition of a power facility; for the renovation of a power facility; and for site work for a power facility.

The project involves the renovation of the existing building located at 37 Wareham Street, Middleborough, MA and the construction of two building additions. In sum, MGED seeks to: (a) convert the existing historic building to include a customer service center on the first floor with offices, meetings rooms, and a kitchen on the second floor; (b) construct a new single-story building to house the electric operations facilities, including the substation and grid management facilities, locker rooms, and materials stockroom and a loading dock; and (c) construct a two-story transition building linking the historic building with the new electric operations building with office spaces, conference rooms, and clerestory lights that will provide vertical transportation between the existing and new buildings. Site improvements include, but are not limited to, new driveways and parking lots, security fencing, and landscaping. The Middleborough Gas & Electric Department will be performing a construction project which involves the partial demolition and renovation of and construction of an addition to the existing electrical operations building. The project entails the preservation of the existing building's historical brick exterior walls on three sides. The construction includes the building of new offices, meeting rooms, a kitchen, lockers, material stockrooms, as well as vertical transportation in a connecting link between the existing and new buildings. Site work including new driveways, sidewalks, landscaping, and security fencing will be completed as well. Work on site will begin in May 2025. The project is composed of multiple bid packages, including early packages to initiate site work, demo, foundations, and structural steel in advance of the architectural, mechanical, electrical, plumbing, fire protection, and related work of the electrical operations building . The project will be subject to the minimum wage rates set under the Massachusetts Prevailing Wage Laws. The total estimated cost of the Project is approximately $18,200,000 and the construction duration is approximately eighteen (18) months All questions asked during the Pre-Bid Walkthrough must be submitted online All requests for information (RFI's) must be e-mailed to Tom Doolittle, Skanska tom.doolittle@skanska.com. - Pre-Bid RFIs due June 2nd 2025

Post-Bid

Power Plant

$18,200,000.00

Public - City

Addition, Demolition, LEED Certification, Renovation, Site Work

155

36

2

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

June 17, 2025

Project location map

37 Wareham St, Middleborough, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.