BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Roseau, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a bridge / tunnel; bridge / tunnel; for outdoor lighting for a bridge / tunnel; and bridge / tunnel.

Description: The Roseau Pedestrian Bridge Project will consist of placing a new pedestrian bridge over the Roseau River, approaches, concrete shared-use path, and lighting. The Project includes the following major items and approximate quantities: Pedestrian Bridge (Superstructure) 1Lump Sum Lighting System 1 Lump Sum 6" Concrete Walk 6173 Cu. Yd. Structural Concrete (3B52) 91 Cu. Yd. Structural Concrete (1G52) 53 Cu. Yd. Est. Completion Date: Oct. 3, 2026 Contract award will be based on the lowest and/or best qualified responsible Bidder, ability to complete the work within the specified time frame, or at the discretion of the Owner. A single contract will be awarded for the work.

Award

Bridges / Tunnels

$1,619,500.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

67

9

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
33
Bidding Soon
491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 17, 2025

Project location map

To Be Determined, Roseau, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.