BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2025 at 8:00 PM

Updated June 20, 2025

Renovation of an educational facility in Norway, Michigan. Completed plans call for the renovation of a 31,000-square-foot educational facility.

Bidders are required to bid the entire Trade Package using the Bid Proposal Form and attaching the Affidavit of Bidder and Affidavit of Compliance - Iran Economic Sanctions Act. A Bid Security shall accompany bid in the form of a bid bond or certified check for no less than five (5%) percent of the Bid Price. The Successful Bidders will be required to provide performance and payment bonds if the contract award is greater than $25,000. This project is subject to Michigan Prevailing Wages. Question Deadline 06/13/2025 The Project consists of the removal and replacement of flooring, the removal and replacement of lockers, and the resurfacing of the gym flooring. The scope of work is to include, but is not limited to, the following items: 1. All selective interior architectural demolition. Include all dumpsters and dump fees needed to complete this scope of work. 2. Install and maintain all dust partitions, temp enclosures and floor protection of existing or new finishes as required to complete the work within this package. 3. Remove and dispose of all lockers. 4. All demolition and removal of the 4" concrete pad that the existing lockers currently sit on. Demo concrete pad up to existing slab on grade floor elevation. 5. Furnish and install new lockers. 6. All sealants and caulking associated with this trade package. 7. Progress cleaning as directed by the Construction Manager to maintain and keep a safe working area.Excluded from this Subcontractor's work is: 1. Drywall, painting, flooring, and acoustic ceilings. 2. Flooring removals. 3. Patching of floor where locker bases were removed. Patching and preparation to be included in Trade Package 09 6500 Flooring.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

24

17

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
9
Bidding Soon
172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

July 18, 2025

Project location map

300 Section St, Norway, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.