BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated December 3, 2025

Site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in Seattle, Washington. Completed plans call for site work for a municipal facility; for outdoor lighting for a municipal facility; for paving for a municipal facility; for the renovation of a playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; road / highway; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; water / sewer project; for the construction of a municipal facility; military facility; and military facility.

The U.S. Army Corps of Engineers (USACE) Seattle District has a requirement to construct a new five-story 200-person UEPH Barracks. Primary facilities include living and sleeping quarters, baths, storage, service areas, information systems, fire protection and alarm systems, Energy Monitoring Control Systems (EMCS) connection, and cybersecurity measures. Supporting facilities include site development such as demolition, utility connections, electrical power, telecommunications, streetlights, pedestrian lights, site lighting, street paving, road improvements, parking, sidewalks, curbs and gutters, potable water, stormwater, wastewater, information systems, landscaping, signage, and sport courts. Heating and air conditioning will be provided by a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. The UEPH will be occupied by able-bodied soldiers; therefore, access for individuals with disabilities will be provided only in the lobby area. Facilities will be designed to a minimum service life of 40 years in accordance with DoD's UFC (Unified Facilities Criteria) 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. In accordance with DFARS 252.236.204, the construction cost of this project will be subject to the disclosure of the magnitude of construction project, which is estimated to be between $100,000,000 and $250,000,000. If you have any questions, please contact Edgar Conde, Estimator: Edgar.Conde@AbsherCo.com

Under Construction

Military

$250,000,000.00

Public - Federal

New Construction, Outdoor Lighting, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
93
Bidding Soon
1,387
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

August 1, 2025

Project location map

4735 E Marginal Wy S, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.