Site work and paving for a bridge / tunnel in Quitman, Georgia. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Hickory Head Road Bridge Improvements Piscola Creek as shown on the construction drawings. In general, construction consists of traffic control, clearing, joint steel repair, pile encasement, rip-rap placement, and all associated measures for the complete project. Time allotted for completion of work is 30 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 45 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Any Contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. All bid forms must be accompanied by a Bid Bond or a certified cashier's check in an amount not less than ten percent (10%) of the amount bid. All bonds shall be by a surety company licensed in Georgia with "A" minimum rating performance and financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities and to re-advertise. Document Note: Upon request and receipt of the document payment indicated above, Watkins & Associates, LLC will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Engineer. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Office of the Engineer. Question Deadline 06/14/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing
Post-Bid
Bridges / Tunnels
$900,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2025
July 24, 2025
Hickory Head Rd, Quitman, GA
Related To This Project
Quitman, GA
Bid Date: Jun 24 2025
Quitman, GA
Bid Date: Jun 24 2025
Quitman, GA
Bid Date: May 05 2026
Quitman, GA
Bid Date: May 05 2026
Quitman, GA
Bid Date: Apr 23 2019
Quitman, GA
Bid Date: Dec 12 2018
Quitman, GA
Bid Date: Aug 10 2021
Quitman, GA
--
Quitman, GA
Bid Date: Jun 28 2024
Quitman, GA
Bid Date: Apr 26 2024
Quitman, GA
Bid Date: Apr 26 2024
Quitman, GA
Bid Date: Apr 26 2024
Quitman, GA
Bid Date: Jan 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.