Published June 11, 2025 at 8:00 PM

Updated June 25, 2025

Site work and paving for a bridge / tunnel in Quitman, Georgia. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Hickory Head Road Bridge Improvements Piscola Creek as shown on the construction drawings. In general, construction consists of traffic control, clearing, joint steel repair, pile encasement, rip-rap placement, and all associated measures for the complete project. Time allotted for completion of work is 30 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 45 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Any Contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. All bid forms must be accompanied by a Bid Bond or a certified cashier's check in an amount not less than ten percent (10%) of the amount bid. All bonds shall be by a surety company licensed in Georgia with "A" minimum rating performance and financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities and to re-advertise. Document Note: Upon request and receipt of the document payment indicated above, Watkins & Associates, LLC will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Engineer. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Office of the Engineer. Question Deadline 06/14/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing

Post-Bid

Bridges / Tunnels

$900,000.00

Public - County

Paving, Site Work

7

18

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
4
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

Hickory Head Rd, Quitman, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.