Published May 29, 2025 at 8:00 PM

Updated June 19, 2025

Site work and paving for a civil project in Marysville, Washington. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

DESCRIPTION OF WORK This project includes the replacement of one culvert on Coho Creek with a Timber Bridge provided by the Contracting Agency. The Work occurs on Tulalip Property and the Contractor is not required to maintain access across the Creek during the project. The Work includes the design, fabrication, and installation of Helical Piles as Noted in the Plans, Specifications, and Shop Drawings for the Bridge along with the design, fabrication, and installation of steel brackets to connect each pile to provided timber sill. The Contractor is responsible for designing and installing piles for provided bridge reaction and WSDOT Bridge Design Manual LRFD. The Contractor shall describe their Work Plan for Pile Installation as part of their Proposal. The following work elements are summarized below, separated by the Engineer's assumptions on schedule, means and methods: Construction Plans are provided as Appendix A. Work Performed includes: Temporary Traffic Control. Receiving, Unloading, staging, and Installing One (1) Timber Bridge and Timber Sills Designing, Fabricating, and Installing Helical Piles and associated bracket connections that can secure piles to the bridge. Clearing and grubbing, including tree salvage. Site preparation; temporary erosion and sediment controls, temporary stream bypass, dewatering, and temporary access and staging areas. Channel Excavation and Streambed Installation Gabion Basket Installation Balance all excavations at locally designated locations (this project has no off-site haul). Site restoration; temporary erosion control seed mix, roadside cleanup, project closeout. This list is not exhaustive and the Contractor shall refer to the proposal schedule, special provisions, and Contract Plans for a description of the work to be performed and requirements. The contractor is responsible for work sequencing and efficiently and timely completing the work. With the exception of Temporary Erosion Control seeding, Planting shall be performed by the Tribe. The Engineer's Estimate ranges from $250,000 - $350,000 in total. . Question Deadline 06/11/2025 Last Day for Submittal of Questions. Any prospective Offeror having questions or desire an explanation or interpretation of the Proposal Documents are requested to contact: Matt Pouley The Tulalip Tribes of Washington 6406 Marine Drive, Tulalip, WA 98271 360-716-4599 mattpouley@tulaliptribes-nsn.gov Tentative Notice of Award June 20th, 2025 It is recommended that Offerors "Register" in order to receive automatic e-mail notification of future addenda and to place themselves on the "Self-Registered Bidders List". Offerors that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. Technical Questions regarding this project should be submitted via email at least three (3) working days before the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$350,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
119
Bidding Soon
1,714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

February 17, 2026

Project location map

To Be Determined, Marysville, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.