BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.

The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. 1. Remove and properly dispose of all trash, furniture and miscellaneous items in the unit. 2. Supply and install all new window blinds (2 inch faux wood blinds) 3. Remove all existing appliances and range hood 4. Abate any mold observed throughout unit 5. Supply and install closet shelving/rod 6. Clean behind all Radiators 7. Final cleaning of entire unit to make ready for occupancy including cleaning behind radiators and waxing floors upon exiting unit for turnover to maintenance dept. 8. Ensure unit is ready for Lead inspection upon completion. Kitchen: 1. Supply and install Broan #4100 range hood (Black) 2. Close off existing wall fan and wire new range hood. ( where necessary ) 3. Install Range hood light bulb 4. Supply & Install HUD severe use base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey'" 5. Insure toe kick is installed under cabinets 6. Install Postformed Wilsonart Black Granite Laminate countertops 7. Supply and install heat shield/backsplash for stove 8. Supply and install kitchen sink and faucet 9. Appliances are to provided by Housing and installed by contractor. Bathrooms: 1. Supply and install Vanity Cabinet w/ vanity bowl and faucet (18 inch - 2 piece combo white) 2. Remove existing tub and install New tub 3. Supply and install ceramic tile tub wall to ceiling (Tile 12x24 color- white and grey or black marble) 4. Wrap window well and sill with same tile as wall 5. Supply and install One (1) new elongated toilet /w toilet seat (Seasons Raleigh All In One) 6. Supply and install New Medicine Cabinet with Mirror 7. Supply and install all new bathroom accessories, (towel bar,soap dish,toothbrush holdershower pole-attached) non-UFAS Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks or broken valves. 2. Check and inspect Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace washing machine outlet box and valves 5. Replace all water shut off valves 6. Install New shower diverter ( Delta R10000-UNWS) and trim package (Delta rp19809) 7. Ensure all pest entry points are sealed ( walls and around plumbing, behind radiators) Electrical: 1. Replace all light fixtures with LED integrated light fixtures 13 inch kitchen - 11 inch hallways. 2. Supply and install 10yr sealed smoke detector in each bedroom. CO/Smoke Combo in hallway and kitchen area 3. Replace all switches and receptacles / w plates throughout unit (White) 4. Inspect electrical panel for gaps or missing breakers Replace or Repair 5. Install Ceiling fans in all bedroom(s) and living room (52 inch Seasons LED Brushed Nickel # 323157592) 6. Remove all electrical raceway and install conduit and surface mount boxes for outlets ( 20 Amp ) Doors & Windows: 1. Supply and install solid core two panel arch top door(s) with knob hardware on existing frames 2. Repair windows in unit ( Broken panes, locks, and balances) 3. Replace window if unable to repair. 4. Replace exterior door(s) and hardware including mail slot, peephole- Meatal exterior door and frame - HD Wood-Edge High Definition Steel entry door 5. 2 inch Faux wood blinds - White Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors and door jams shall receive a semi-gloss final finish coat. o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. ( to include there is no flacking, chipping or peeling paint within 35 of unit ) o Ensure that all exterior railings, awnings, and walls to unit and both adjacent units left and right have no peeling flaking or chipping paint. 2. Paint all doors, trim, and window frames with semi-gloss or DTM paint 3. Paint all radiators with DTM paint- White Flooring: 1. Supply and install Lifeproof Rigid Core Luxury Vinyl Flooring 5mm in Pelican Gray or equivalent thickness and color throughout entire unit 2. All floors must be level before applying flooring. 3. Supply and install new six-inch wood base and quarter round shoe molding throughout entire unit & paint simi gloss white.

Bid Results

Residential Subdivision

$17,900.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
228
Bidding Soon
3,657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

1118 Abbott Ct, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.