Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Site work and asbestos abatement for a residential development in Batavia, New York. Completed plans call for site work for a residential development; and for asbestos abatement for a residential development.
Scope of work to be contracted directly with City of Batavia Citywide Housing Rehabilitation Program: 1. Contractor is to read the Pre-Renovation Asbestos Inspection Report prepared by Stohl Environmental 2. Contractor shall remove all (approximately 9 square feet total) asbestos-containing repair tar from the chimney, repair areas, and roof penetrations. a. Minor asbestos project removal procedure: b. Removal shall be conducted per the requirements of New York State Industrial Code Rule 56 Section 11.6 - Exterior Non-friable removal. Wet methods shall be utilized. o The immediate work area shall be considered to be the area from which the asbestos containing materials are actively being removed. The asbestos project regulated abatement work area shall extend twenty-five (25') feet from the perimeter of the immediate work area and shall have signage in accordance with Section 56-7.4. o Regulated abatement work area preparation shall also comply with Sections 56-7.2, 7.3, 7.4, 7.5, 7.6, 7.7 and 7.9. o All openings (including operable windows, doors, ducts, grilles, communicating openings, etc.) one (1) story above and one (1) story below the roof level of the regulated abatement work area (this includes any building/structure within twenty-five (25) feet of the immediate work area), shall be sealed directly with two (2) layers of at least six (6) mil flame-retardant plastic sheeting. All vent openings which cannot be sealed shall be extended vertically a minimum of eight (8) feet and remain in operation. o A polyethylene drape or curtain may be used instead of plasticizing the windows individually. The drape may be removed after the asbestos project is complete. o Removal of ACM shall utilize manual wet methods for all non-friable ACM removals. In no event shall methods be used that may render the ACM friable. o Asbestos containing materials will not be allowed to accumulate in the work area or on the drop cloth. o Final clean-up and clearance procedures for abatement shall comply with Section 56-9, except that only one (1) stage of cleaning (final) is to be performed. Lockdown encapsulant use is not required. o A visual inspection shall be completed by the asbestos abatement contractor's supervisor to confirm that the scope of abatement work for the asbestos project is complete, and no visible debris/residue, pools of liquid, or condensation remain. The results of this inspection shall be documented by the asbestos abatement contractor's supervisor in the asbestos abatement contractor daily project log, and once the asbestos project is complete the asbestos abatement contractor's supervisor shall also obtain the owner's written acceptance of the final results of the asbestos project within the daily project log. o All waste generated as part of the asbestos project shall be removed from the site within ten (10) calendar days after successful completion of Phase II C for all regulated abatement work areas at the site. All waste generated during the asbestos project shall be legally disposed of at an approved landfill facility. All generated waste removed from the site must be documented, accounted for and disposed of in compliance with the requirements of EPA NESHAP. Requests for information are directed to Paul Maier at Stohl Environmental. a. pmaier@stohlenvironmental.com b. 585-409-1666
Post-Bid
Residential Subdivision
$300,000.00
Public - City
Asbestos Abatement, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2025
July 18, 2025
Multiple Locations, Batavia, NY
Related To This Project
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 20 2025
Batavia, NY
Bid Date: Jun 05 2025
Batavia, NY
Bid Date: Jul 10 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 18 2025
Batavia, NY
Bid Date: Jun 05 2025
Batavia, NY
Bid Date: Jun 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
