Renovation of a mixed-use development in Portage La Prairie, Manitoba. Completed plans call for the renovation of a educational facility.

Reference Number 0000294878 Question Acceptance Deadline 2025/06/10 02:00:00 PM CDT Upgrade to existing CCTV and communication cabling systems at Fort la Reine School & Fort la Reine School in Portage la Prairie, MB. 1 Modes of Operation The UPS shall be designed to operate as an on-line reverse transfer system in the following modes: 1 Normal-The critical AC load is continuously supplied by the UPS inverter. The rectifier/charger derives power from a utility AC source and supplies DC power to the inverter while simultaneously. Emergency - Upon failure of utility AC power, the critical AC load is supplied by the inverter, which without any switching obtains power from the battery. There shall be no interruption in power to the critical load upon failure or restoration of the utility AC source. Recharge - Upon restoration of utility AC power, after a utility AC power outage, the rectifier/charger shall automatically restart, walk-in, and gradually assume the inverter and battery recharge loads. 4 Bypass If the UPS must be taken out of service for maintenance or repair, or should the inverter overload capacity be exceeded, the static transfer switch shall perform a reverse transfer of the load from the inverter to the bypass source with no interruption in power to the critical AC load. 5 Computer hardware/software shall be "Year 2000" compliant. 2 Design Requirements - UPS Module Dual Input 1 Voltage: Input/output voltage specification of the UPS shall be: 2 Rectifier: Input 600 volts, three phase, 3 wire plus ground. 3 Bypass: Input 120/208 volts, three phase, 4 wire plus ground. 4 Output Load Capacity specified output load capacity of the UPS shall be 65kVA al 0.8 lagging power factor. 5 Field-Installable Power Upgrade: Selected systems shall be able to accept a field installed power upgrade to the next highest power rating without an increase in cabinet size, as follows: 1 *65 KVA UPS modules can be field upgraded to 75 KVA 3 Design Requirements - UPS Module Single Input. Voltage: Input/output voltage specification of the UPS shall be: 1 Input: 600 volts, three phase, 3 wire plus ground. 2 Output: 120/208 volts, three phase, 4 wire plus ground. 2 Output Load Capacity - Specified output load capacity of the UPS shall be 65 kVA at 0.8 lagging power factor. 3 Field-Installable Power Upgrade: Selected systems shall be able to accept a field-installed power upgrade to the next highest power rating without an increase in cabinet size, as follows: 1 *65 KVA UPS module can be field upgraded to 75 kVA. 4 Design Requirements - Matching battery Cabinet Battery Cells-Sealed, lead-acid, valve-regulated. Reserve Time - 28 minutes at full load, 0.8 power factor, with ambient temperature between 20 and 30 C. 3 Recharge Time To 95% capacity within ten (10) times discharge rate. 5 Performance Requirements Bids shall be accompanied by a security deposit as follows: Bid bond or certified cheque in an amount not less than 10 percent of the bid price. The accepted bidder shall provide a Labour and Material Bond for 50% of the Contract amount, and a Performance Assurance Bond in the amount of 50% of the Contract amount. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

12

8

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
51
Bidding Soon
544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 17, 2025

Project location map

Multiple Locations, Portage La Prairie, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.