BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work and new construction of a water / sewer project in North Grafton, Massachusetts. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The work consists of construction of a 1.01 MGD PFAS and Greensand Water Treatment Plant at 98 Worcester Street in a new 6,400 SF stone masonry building. The work includes, but is not limited to, site work, drainage infrastructure, process piping, process equipment, HVAC, plumbing, fire protection, electrical, instrumentation, and SCADA. The project shall be completed within 850 calendar days of the Notice to Proceed. Construction is expected to begin in the Winter 2025/2026. The Work will be substantially completed within 790 calendar days from the date of the Notice to Proceed. In Phase II, the prequalified respondents will be invited to submit bids in response to an RFP which is anticipated to be issued on July 30, 2025. Only General Contractor and Sub-Contractor firms prequalified for this project in Phase I will be permitted to submit bids in Phase II a certificate of eligibility issued by the Division of Capital Asset Management and Maintenance (DCAMM), showing that the firm has been approved to bid on projects of the size and nature as advertised herein. Interested General Contractors and Subcontractors must also submit an updated statement summarizing the irrecord for the period between the latest DCAMM certificate and the date of the SOQ submittal.

Final Planning

Water / Sewer

$20,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

March 2, 2026

Project location map

98 Worcester St, North Grafton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.