Site work for a bridge / tunnel in Perry, Georgia. Completed plans call for site work for a bridge / tunnel.

**As of July 24 , 2025 , This project has been awarded to Buxton Construction in the amount of $804,546.67.** Bids for all material, labor and equipment for the "Stonegate Trail Culvert Replacement". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: The project is a replacement of four existing 48" RCP culverts with three 5' x 10' concrete box culverts. This contract is local funded. Each Bidder must deposit with his bid, security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 iInstruction to Bidders. The project shall be Substantially Complete within 180 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $500 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $500 per day for each calendar day required to achieve Final Completion. The City of Perry will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and State of Georgia Legal Holidays. The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. ** doc info :It is the Bidderis responsibility to ensure they have all bidding documents and addendums from the online , and verify that payment has been received by Integrated Science & Engineering. For any technical questions, contact Cary Dial, P.E. - cdial@intse.com or Chad McMurrian n chad.mcmurrian@perry-ga.gov. Project#: 1795.2402 Question Deadline 06/19/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via Email Communication to Chad McMurrian - chad.mcmurrian@perry-ga.gov and Cary Dial, P.E. - cdial@intse.com

Award

Bridges / Tunnels

$804,567.00

Public - City

Site Work

26

20

2

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
41
Bidding Soon
698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

Stonegate Trail, Perry, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.