Site work for a water / sewer project in Perry, Georgia. Completed plans call for site work for a water / sewer project.
**As of August 15, 2025 , project has not been awarded yet,Notice of Award will have to be sent to the City after Due Diligence and then sent to council for approval.30-45 days or so.” ** Scope of Work The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of approximately 1,110 LF of 12 DR11 HDPE sewer force main, 5,150 LF 12 DR17 HDPE sewer force main, 230 LF 12 C900 DR25 PVC sewer force main, 1,570 LF 10 C900 DR25 PVC sewer force main, , and 140 LF 6 C900 DR25 PVC sewer force main along with associated fittings, valves, connections and all appurtenances. Approximately 1100 LF of 12 HDPE will be installed via horizontal directional bore under Mossy Creek and associated wetlands. The time allotted for substantial completion of the work is 150 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 180 consecutive calendar days from the Notice to Proceed. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (706) 765-8767. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00410, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise. Question Deadline 08/05/2025 at 5:00 PM ET Every request for such interpretation should be made in writing and addressed to William Jones, GWES, LLC, 733 Carroll Street, Perry, Ga. 31069 or email at william.jones@gwesllc.com , and to be given consideration must be received at least five (5) business days prior to the date fixed for opening Bids. 2024028 Project No. 033.69.1.23 The site is located in the Fort Valley Plateau District of the Coastal Plain Province in Perry, Houston County, Georgia.
Award
Water / Sewer
$1,036,263.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 11, 2025
To Be Determined, Perry, GA
Related To This Project
Perry, GA
Bid Date: Aug 15 2025
Perry, GA
Bid Date: Aug 14 2025
Perry, GA
Bid Date: Aug 20 2025
Perry, GA
Bid Date: Aug 20 2025
Perry, GA
--
Perry, GA
--
Perry, GA
--
Perry, GA
Bid Date: Jul 22 2025
Perry, GA
Bid Date: Jul 28 2025
Perry, GA
Bid Date: Jul 18 2025
Perry, GA
Bid Date: Jun 26 2025
Perry, GA
Bid Date: Jul 02 2025
Perry, GA
Bid Date: Jun 26 2025
Perry, GA
Bid Date: Jun 25 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.