Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 21, 2025 at 8:00 PM
Updated July 22, 2025
Site work and paving for a civil project in Quitman, Mississippi. Completed plans call for site work for a water / sewer project.
New Triplex Pump Station, Electrical and Controls, Submersible pumps, Security Fencing, Asphalt and other related Items. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 180 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed in the amount of the actual costs incurred for each consecutive calendar day beyond the specified contract time. Special Damages: In addition to the amounts provided for liquidated damages, expenses and other losses, Contractor, in the event of such default, shall pay to the Owner the actual costs, expenses and other losses reasonably incurred by Owner. Bidder must be qualified under Mississippi Law and show current Certificate of Responsibility issued by the Mississippi State Board of Public Contractors establishing his classification as to the value and type of construction on which he is authorized to bid Proposals be submitted in duplicate, sealed and deposited with the City of Quitman, Mississippi prior to the hour and date hereinbefore designated. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Each Bidder must submit with his proposal a separate attachment stating his qualifications to perform the work. The Statement of Qualifications shall list past projects of similar size and nature, a list of references with name and telephone number, a list of key personnel who will perform the work, and other information supporting the Bidder's qualifications. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident Bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippi's so-called Golden Rule is followed state law requires a non-resident bidder to attach to his bid a copy of his resident state's current laws pertaining to such state's treatment of nonresident contractors. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the City of Quitman, Mississippi, as bid security. Bidders shall also submit a current financial statement, if requested, by the City of Quitman, Mississippi. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount. Question Deadline 06/28/2025: All questions about the meaning or intent of the Contract Documents are to be directed to Architect/Engineer
Award
Water / Sewer
$703,385.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
August 7, 2025
To Be Determined, Quitman, MS
Related To This Project
Quitman, MS
Bid Date: Aug 15 2025
Quitman, MS
Bid Date: Aug 21 2025
Quitman, MS
Bid Date: Sep 02 2025
Quitman, MS
Bid Date: Oct 06 2025
Quitman, MS
Bid Date: Nov 18 2025
Quitman, MS
Bid Date: Nov 18 2025
Quitman, MS
Bid Date: Jul 08 2025
Quitman, MS
Bid Date: Jun 17 2025
Quitman, MS
Bid Date: May 09 2025
Quitman, MS
Bid Date: Apr 28 2025
Quitman, MS
Bid Date: May 30 2025
Quitman, MS
Bid Date: Jun 17 2025
Quitman, MS
Bid Date: Mar 06 2025
Quitman, MS
Bid Date: Dec 20 2024
Quitman, MS
Bid Date: Dec 16 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
