BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Project generally involves evaluating the condition of 30 selected 6-, 8- and 10- inch diameter Vitrified Clay Pipe (VCP) sewer segments, approximately 7,800 linear feet, performing necessary open-trench point repairs prior to lining, and installing approximately 7,800 linear feet of Cured-In-Place Pipe (CIPP) Liner. A representative of the Director of Public Works will publicly open and declare the aggregate bid of each bidder, using the Zoom virtual meeting platform, shortly after the filing deadline. Interested parties can access the virtual bid opening by visiting website. Bidders must submit questions or requests for information concerning any part of this bid in writing to the City via website. The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via website no later than Thursday, June 19, 2025 at 11:00 am. The work to be done under this contract consists of, in general, but not limited to: preconstruction CCTV of 30 selected 6-inch, 8-inch and 10-inch vitrified clay pipe (VCP) segments (7,746 linear feet), point repairs to existing segments where recommended by the Contractor and agreed to by the Engineer, and installation of cured-in-place pipe (CIPP) liner to all segments. This project also includes the reconnection of active sanitary sewer service laterals, reconstruction of active sanitary sewer service laterals, reinstatement of active sanitary sewer service laterals, removal and replacement of one sanitary sewer manhole, removal of one sanitary sewer flushing inlet and replacement with one sanitary sewer manhole, removal of rungs in applicable manholes, rehabilitation of existing sanitary sewer manholes, and photographic inspection of existing sanitary sewer manholes. The work shall include, but not restricted to, clearing, grubbing, and removal of obstructions, laying and installing new pipe conduit for the sanitary sewer system; saw cutting; removal and/or abandonment of existing pipelines and manholes; pavement restoration; removal and restoration of existing curb and gutter, removal and restoration of existing median island landscape; cleaning and video inspection of existing sewer mains and service laterals; protection of existing utilities and appurtenances and such other items and details required by these Special Provisions, the Plans, and the Standard Specifications and the Standard Details.

Award

Water / Sewer

$1,467,810.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

27

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
178
Bidding Soon
2,610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 25, 2025

Project location map

Multiple Locations, San Jose, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.