Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and renovation of a water / sewer project in Rock Island, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Bids from contractors for a rehabilitation project at a house located at 719 4th Street. This owner-occupied property will be undergoing rehabilitation using Housing and Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. All questions shall be directed to the Construction Officer at 309-732-2906. Scope of Work The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Plumbing o Remove existing 40-gallon gas fired gravity water heater. Install new short 40-gallon High efficient gas fired water heater, do not use Richmond brand. Turn the new unit so that the front of the water heater is accessible. Replace the old brass inline shut of valve with new inline shut off. Install an TPRV line no less the 6" from the floor with approved material . Install the PVC flue to the exterior of the home and fresh air intake near the flue following manufacture's installation. There is a power source close by to add a receptacle for the power vent. Water Heater must be lit and operational at the proper temps before leaving. o Remove all the galvanized water supply lines from the meter in the basement converting to new copper. Install new washing machine hook ups in the basement. Install shut offs to all the fixtures on the first floor. Remove screens from the fixtures upon completing the new plumbing system to flush the new lines. o Install a silcock in the existing location using frost-free prevention and isolated shutoff. o Remove all the existing gas lines from the meter. Install new hard pipe approved gas piping to the furnace, water heater, dryer, and Stove. Install shut offs at each fixture with drip legs. Install hanger per code. HVAC o Remove most of the existing duct work in the basement. o Install new main supply trunk and takeoffs with floor registers. As of now there are only 3 existing lines suppling heat to one area of the home. o Install proper return air duct work and panning in the basement to serve the home air circulation. o Install furnace rack with covering that is the correct size to fit the return air duct work. o Tape or dope paste all the joints, seams, and penetrations. o Reinstall the thermostat at higher elevation on the wall. o Install Condensation pump and new line off the furnace to floor drain. Install the Electrical panel cover with 4 screws. The panel cover is there next to the panel. Plumbing and Mechanical permits required before work starts. Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged. The primary contact person for this project is the City's Construction Officer. Jeff Laxton CED Department 1528 3rd Avenue Rock Island, IL 61201 309-732-2906 laxton.jeff@rigov.org The lowest bid shall not automatically guarantee that a contractor will get the work they bid on. Bids shall be reviewed for pricing, experience, previous work history, references, State Licenses, State Registration, insurances, bonds, subcontractors, equipment owned, equipment rented, operator experience, and financial stability. The City at its sole discretion shall decide after a review which contractor, if any, is responsive to the invitation to bid. All bidding and award procedures undertaken by the City in regard to this project shall be consistent with the City's adopted procurement procedures. Submitted bid prices shall remain valid for 60 days after bid opening.
Bid Results
Water / Sewer
$19,890.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
July 1, 2025
719 4th St, Rock Island, IL
Related To This Project
Rock Island, IL
Bid Date: Jun 12 2025
Rock Island, IL
Bid Date: Jun 05 2025
Rock Island, IL
Bid Date: Jul 31 2025
Rock Island, IL
Bid Date: Aug 02 2025
Rock Island, IL
--
Rock Island, IL
Bid Date: Aug 11 2025
Rock Island, IL
Bid Date: Jun 23 2025
Rock Island, IL
Bid Date: Jul 02 2025
Rock Island, IL
Bid Date: May 28 2025
Rock Island, IL
Bid Date: May 15 2025
Rock Island, IL
Bid Date: May 13 2025
Rock Island, IL
Bid Date: May 15 2025
Rock Island, IL
--
Rock Island, IL
Bid Date: May 08 2025
Rock Island, IL
Bid Date: Jul 09 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--