Site work for a power facility in Fort Wayne, Indiana. Completed plans call for site work for a power facility.
The fair share goal of contracts and subcontracts to be awarded to MBEs and WBEs and their participation in the Contractors aggregate workforce in each trade on all construction work for the subject project are as follows MBEs 7 % WBEs 5 % Question Deadline 06/16/2025 Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. A. The Work is located at the Fort Wayne Indiana Water Pollution Control Plant, 2601 Dwenger Ave, Fort Wayne, IN 46803. B. The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all related appurtenances. The Work includes, but is not limited to, the following 1. Installation of the RNG System Equipment. 2. Furnish and installation of all equipment, interconnecting piping, architectural, structural, HVAC, electrical, and instrumentation work. 3. Interconnection site. C. Contracting Method: The Project shall be constructed under one prime Contract. D. The Work shall be performed in such a manner that minimizes shutdown and disruption of the Owner's facilities. E. OWNER-furnished Materials and Equipment: 1. RNG system equipment per Section 433260 "Biogas Membrane Separation System Installation". 2. Transformer T2 that is being relocated per the Drawings. Description: The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, WPCP Renewable Natural Gas Facilities as follows: Installation of Owner provided packaged biogas membrane separation system, media, and all appurtenances. Additionally, furnish and install cooling water system equipment, associated piping, reject gas flare, interconnecting piping, interconnecting equipment, and instruments. Bidders with the proposed project and to answer any questions. There will also be an online meeting at the same time with the meeting details provided through Website . Prospective bidders may attend in person, or the online meeting . All questions not presented in this meeting are to be submitted to Zachary Katter (e-mail: zachary.katter@cityoffortwayne.org) no later than 5:00 p.m. local time Wednesday (6/18/2025) and will be addressed in the Addendum. A final addendum will be issued the Friday before the project bid opening.
Award
Thermal Power Generation
$6,593,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
July 28, 2025
To Be Determined, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Jun 19 2025
Fort Wayne, IN
Bid Date: Jul 09 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 20 2025
Fort Wayne, IN
Bid Date: Jun 24 2025
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Jul 03 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: May 30 2025
Fort Wayne, IN
Bid Date: Jun 13 2025
Fort Wayne, IN
Bid Date: Jun 20 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 11 2025
Fort Wayne, IN
Bid Date: Jun 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.